Laserfiche WebLink
Generation of Solar Power at Garthe and West Pump Station Facilities Project <br />a I:I Bureau of Reclamation Water Energy and Efficiency Grant FY2022 <br />emissions. In doing so, the Project addresses this adaptation strategy specifically <br />identified in the completed Watersmart Basin Study. <br />D.5.2. Subcriterion D.2— Readiness to Proceed <br />Identify and provide a summary description of the major tasks necessary to complete the <br />project. Note: please do not repeat the more detailed technical project description <br />provided in Section D.2.2.4.; this section should focus on a summary of the major tasks to <br />be accomplished as part of the project. <br />1. City of Santa Ana Building Dept. to issue appropriate building permits. <br />2. Southern California Edison (SCE) to approve plans and issue permit. <br />3. City staff to implement Public Bid process to determine the lowest responsible bidder, in <br />compliance with State of California Public Contracts Code. <br />4. Santa Ana City Council to award construction contract (to the lowest responsible <br />bidder). <br />5. City will manage the project during construction phase. <br />6. Grant Compliance: The City of Santa Ana has professional grant consultants on contract <br />that will utilize to assure all the Bureau of Reclamation requirements are met in a timely <br />manner. <br />• Describe any permits that will be required, along with the process for obtaining such <br />permits. <br />Following permits will be required: <br />• City of Santa Ana Building Department permit <br />• SCE permit <br />• Identify and describe any engineering or design work performed specifically in support of <br />the proposed project. <br />Newcomb Anderson McCormick (NAM), a Willan Company prepared a "Water Systems <br />Alternative Energy Feasibility Study" which the City approved in February 2019. This <br />study included an evaluation of the potential to install on -site renewable energy <br />systems to offset some of the City's electrical load, lower electric bills, and reduce the <br />associated greenhouse gas (GHG) emissions. The renewable energy resources that were <br />evaluated included installing solar PV modules on the roofs of the storage tanks at the <br />Garthe and West pump stations and included some preliminary designs. These designs <br />were simulated using HelioScope, an industry standard PV simulation program. This <br />program uses a local weather data file and calculates the hourly performance of the <br />system based on the angle of insolation, air temperature, wind speed, intensity of <br />clouds, etc. <br />23 <br />PREVIEW Date: Nov 03, 2021 Workspace ID: WS00800354 Funding Opportunity Number: R22AS00023 <br />