Laserfiche WebLink
o Basketball Court <br />o Skate Board Court <br />o Canvas Shade Structure <br />o Pedestrian Bridge <br />o Playground <br />o Decomposed Granite/Decorative Concrete Walkways <br />• Landscape and Irrigation <br />o Site Layout/Construction Plans and Details <br />o Site Sections, as applicable <br />o Planting Plans/Details/Notes <br />o Irrigation Plans/Details/Calculations/Notes <br />o Monument Detail <br />• Electrical <br />o Electrical Site Plan to cover walkway, shade canopy, turf, <br />monument signs, basketball court, and parking lot <br />o Location of panels, switchgear, meters <br />o Single Line Diagram <br />o Schedules <br />o Details <br />o Photometrics <br />o General Notes <br />c) All calculations for the design and quantities shall be submitted as part of the <br />PS&E submittal requirements. Quantities for all contract pay items shall be <br />substantiated by calculations. Quantity calculations shall be neat and orderly and <br />shall show all sketches, diagrams, and dimensions necessary to allow them to be <br />independently used by field inspectors during construction. All quantity <br />calculations shall be independently checked and substantiated with independent <br />calculations. <br />d) Electronic files for all CADD (in Microstation CONNECT), reports, and <br />calculations shall be submitted at the end of contract or when requested by the <br />City. <br />e) All electronic software developed, databases generated, spreadsheets and <br />intellectual properties developed during the life of the Agreement shall become the <br />properties of the City. <br />2. Deliverable PS&E package: <br />a) 30% PS&E <br />The package shall include the concept layout of the park improvement plan, alley <br />and parking lot improvements, landscaping and irrigation, lighting, and cost <br />estimate. <br />City of Santa Ana RFP 21-055 <br />Page Al-5 <br />