My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 14 - Median Landscape Maintenance Services
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2021
>
07/20/2021 Regular
>
Item 14 - Median Landscape Maintenance Services
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/17/2023 5:16:01 PM
Creation date
8/17/2023 5:15:35 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
14
Date
7/20/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
e.Cooperate with local authorities relative to handling traffic through the areaand must make arrangements relative to keeping the working area safe and <br />clear of vehicles. <br />f.Provide a towed or mounted arrow board for all lane closures. <br />g.Note most work should be performed without obstructlng the flow of traffic <br />whenever possible. If lane closure is required, abide by WATCH manual. <br />8.Performance during inclement weather <br />During periods of increment weather, Le. rain/wind; Contractor's workforce shall <br />accomplish work not affected by such weather, I.e. litter pick up/spent blossom <br />removal, preventative maintenance, etc. <br />a.Contractor shall stake and re-tie trees as required. <br />b.Drains shall be checked and cleaned as necessary. <br />c.Contractor shall remove all branches and debris resulting from inclement <br />weather. <br />d.Contractor may be required to perform additional clean-up tasks due toinclement weather. <br />9.Recycling <br />All organic waste (including leaves, grass clippings, brush, branches, and treeparts)resulting from work performed under this contract shall be recycled throughcomposting or processing for use as mulch. Organic waste cannot be taken to the <br />landfill. The names and addresses of the licensed green-waste composting orprocessing companies, and haulers, along with the tonnages used and receipts, shall <br />be provided to the Projects Manager or designee In a monthly written report and anannual written report. <br />10.Disposal <br />At least 100% of all landscape debris will be disposed of through a landscape materialrecyclfng center or reused in some manner. The Contractor shall dispose of all <br />cuttings, weeds, leaves, trash, and other debris from the operation as work <br />progresses. The City shall not be responsible for the disposal. Contractor shall pay <br />all disposal fees and provide documentation evidence of recycling to include location, <br />tonnage, etc. on a monthly basis to the City. <br />Contractor shall dispose of all trash and debris. Contractor shall dispose of alllandscape debris through a landscape material recycling center such as Tierra VerdeIndustries. Contractor shall not dispose of landscape debris In a landfill without priorapproval from the Projects Manager or deslgnee. Contractor shall pay all disposal <br />fees and submit a copy of receipt as part of the landscape monthly reports. At no
The URL can be used to link to this page
Your browser does not support the video tag.