My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 15 - On-Call Environmental Review Services for Federally Funded Programs
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2021
>
07/06/2021 Regular
>
Item 15 - On-Call Environmental Review Services for Federally Funded Programs
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2023 3:43:59 PM
Creation date
8/21/2023 3:41:47 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
15
Date
7/6/2021
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
206
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Deanna M. Hansen, Page 2 <br />Rincon Consultants, Inc. <br />Environmental Scientists · Planners · Engineers <br />Principal, City of South Pasadena – On-call Planning and Entitlement Review Services, South Pasadena <br />Ms. Hansen is providing strategic guidance for entitlement, environmental planning and other planning services to the <br />City on an as-needed basis. Tasks include, but are not limited to, ensuring consistency with the General Plan, Zoning <br />Ordinance (including Hillside Protection regulations) and the Cultural Heritage Ordnance; design guideline review for <br />residential and commercial structures; and soils and grading, drainage, and design compatibility. <br />Project Director/Manager, Orange County – Saddle Crest Homes Project EIR, Orange County <br />Ms. Hansen provided strategic guidance and was the day-to-day project manager on this complex and controversial <br />project in Orange County. Working with the County and the applicant, Ms. Hansen coordinated and participated in <br />meetings with County staff, the applicant’s team, and the public to help facilitate the preparation of the EIR and <br />associated technical studies. The project includes the development of 65 residential homes on an approximately <br />113.7-acre site. The EIR documented potential impacts associated with implementation of the project, including <br />amendments to the Foothill/Trabuco Specific Plan (F/TSP) and the Orange County General Plan to allow for a clustered <br />design on the site and update methodology for analyzing traffic impacts in the project area. The EIR also includes a <br />side-by-side analysis of a non-clustered scenario that meets all the requirements of the F/TSP. The project was <br />approved by the County Board of Supervisors and the EIR survived a legal challenge by local opponents. <br />Project Manager, Orange County – CEQA Guidance Regarding Affordable Housing Provisions, Orange County <br />Ms. Hansen provided strategic guidance and presented various available options to the County of Orange regarding <br />the development of an appropriate CEQA strategy and approach to implement the Ranch Plan’s affordable housing <br />requirements. The affordable housing provisions were not included in the previous CEQA documentation for The <br />Ranch Plan; therefore, some form of CEQA documentation will be required for the affordable housing provisions. In <br />addition, based on the agreements between the County and the Ranch, the County is responsible for all CEQA <br />compliance and permitting requirements associated with the implementation of the affordable housing land <br />dedication and development. Ms. Hansen prepared a memorandum outlining the potential options the County should <br />consider in implementing CEQA compliance for the required affordable housing to be located within the Ranch Plan. <br />Project Director, RSM Properties, LLC – Robinson Ridge EIR, Rancho Santa Margarita <br />Ms. Hansen provided strategic guidance and managed the EIR for the Robinson Ridge project. The project is located in <br />unincorporated Orange County and includes development of approximately 189-acres of land that has been used for a <br />commercial nursery into approximately 200 single-family residential lots, including the construction of a new access <br />road. Key issues include land use, traffic, and visual resources. <br />Project Manager, California Quartet – Saddleback Meadows Subsequent Revised EIR, Orange County <br />Ms. Hansen was the project manager and oversaw preparation of the EIR for the Saddleback Meadows project. CEQA <br />documentation dates back to 1978 (for 705 units) and the proposed project represents a complete revision and <br />redesign of a previously approved and recorded tract map. The project consists of approximately 299 single-family <br />units on an approximate 222-acre site. The project was controversial due to the location of an adjacent monastery and <br />abbey. Key issues include biological resources and geologic issues, traffic, and land use. The project was approved and <br />the EIR was certified by the County of Orange. <br />California State University, Fullerton Master Plan Update EIR, CSU Fullerton <br />Ms. Hansen served as Principal, providing land use and environmental guidance to CSU Fullerton while they develop <br />design ideas to be included in an update to their 2003 Master Development Plan. This includes coordination with a <br />variety of on- and off-campus stakeholders, peer review of design options, and guidance on the potential <br />environmental impacts resulting from future on campus development projects. Rincon has also kicked off preparation <br />of the EIR required as part of the Master Planning process. <br />Project Director, Fullerton School District – NDs, City of Fullerton <br />Ms. Hansen provided strategic guidance on scope and methodology and managed the EIR including project <br />management and preparation of 10 environmental documents for the Fullerton School District. The District proposed <br />to expand seven existing elementary schools with multi-purpose rooms and three existing junior high schools to <br />include gymnasiums. Under the proposed projects, no increase in student population was anticipated. However, due <br />to community concern, Fullerton School District determined that 10 separate Initial Studies/NDs would be prepared <br />for the projects. <br />EXHIBIT 1
The URL can be used to link to this page
Your browser does not support the video tag.