Laserfiche WebLink
Mc Donald's at Santa Clara Avenue Project <br />TASK 1 PROJECT INITIATION <br />Subtask 1.1 Kick -Off Meetin <br />Psomas will attend a virtual or in -person kick-off meeting with the City, the Applicant, and the Project <br />team, as appropriate. This meeting will provide an opportunity to discuss the approach to preparing the <br />environmental document; further define the SOW; identify and discuss the key community issues and <br />concerns, as applicable; and identify information needs. The Project schedule will be discussed, and key <br />milestones defined. It is assumed that available Project information, including an updated site plan, as <br />applicable, would be provided at this meeting. It is also assumed that the technical studies prepared by the <br />Applicant (i.e., a Water Quality Management Plan [WQMP]; Hydrology and Hydraulics Report; <br />Geotechnical Report; and Traffic Analysis) will be provided to Psomas for incorporation into the <br />IS/MND, at this meeting. Psomas also assumes that considering the demolition of the existing residential <br />units on the site, the Applicant will prepare a Phase I Environmental Site Assessment (ESA). <br />If requested, Psomas will prepare and electronically submit the meeting minutes from the kick-off <br />meeting to the City for review and comment. Upon receipt of comments, the meeting minutes will be <br />revised and distributed. <br />Subtask 1.1 Deliverables <br />• Electronic Copies (email) of Draft and Final Meeting Minutes (if requested) <br />Subtask 1.2 Data Collection and Site Visit <br />Psomas will prepare a Data Needs Request to obtain data related to Project construction activities and <br />operations that will be needed for the technical analyses contained in the IS/MND. Work can typically <br />proceed on tasks that are not dependent on forthcoming information. Psomas will review existing City <br />documents, including but not limited to the Santa Ana General Plan (2022); the General Plan Final <br />Recirculated Draft EIR (2021) (General Plan EIR); the Zoning Ordinance; and otherpertinent documents. <br />Additionally, Psomas will conduct a site visit to assist in the description of the environmental setting and <br />to photographically document the site and surrounding area. <br />Subtask 1.2 Deliverables <br />Electronic Copy (email) of Data Needs Request <br />Subtask 1.3 Proiect Description <br />Upon receipt of Project information, Psomas will draft a Project description appropriate for an IS/MND. <br />The Project description will ineludedetails related to short-term construction activities and long-term land <br />uses and operations of the Project. The draft Project Description will be submitted electronically to the <br />City for review and comment. Once approved by the City, the Project description will be distributed to <br />the Project team to initiate technical analyses. <br />Subtask 1.3 Deliverables <br />Electronic Copy (email) of the Draft and Final Project Description <br />a.wro osais�]] orsama MalMmD nM .ISMND-asoi2z.mox A-2 Cost Estimate <br />