Laserfiche WebLink
Construction Contract for the Westminster Avenue Rehabilitation Project from Newhope <br />Street to Harbor Boulevard and Appropriation Adjustment <br />September 19, 2023 <br />Page 3 <br />Bid Results Summary <br />Rank <br />Bidder's Name <br />Location <br />Base Bid <br />1 <br />R.J. Noble Company <br />Orange, CA <br />$1,643,676 <br />2 <br />Onyx Paving Company, Inc. <br />Anaheim, CA <br />$1,693,000 <br />3 <br />All American Asphalt <br />Corona, CA <br />$1,744,103 <br />4 <br />Excel Paving Co <br />Long Beach, CA <br />$1,758,414 <br />5 <br />Hardy & Harper, Inc. <br />Lake Forest, CA <br />$1,830,000 <br />A total of five bids were received, and all were deemed responsive. R.J. Noble <br />Company submitted the lowest responsive base bid in the amount of $1,643,676 <br />(Exhibit 3). As specified in the bid documents, the lowest bid shall be determined on the <br />basis of the Base Bid. Based on the bid analysis and a contractor's reference check, <br />Staff recommends awarding the construction contract to R.J. Noble Company, in the <br />amount of the base bid totaling $1,643,676 (Exhibit 4). <br />R.J. Noble Company has worked satisfactorily on various projects for the City of Santa <br />Ana throughout the last several years. The most recent project was Alton Rehabilitation <br />from Raitt Street to Bristol Street Fiscal Year 2019-2020. <br />Project Delivery <br />To deliver a complete project, in addition to the construction contract, the estimated total <br />project delivery cost includes construction administration, inspection, and testing, along <br />with an allowance for contingencies to account for unexpected or unforeseen <br />conditions. Construction administration and inspection includes construction <br />management; inspection of the Contractor's work to ensure contract compliance, <br />workmanship, and quality; and materials testing. As indicated in the Cost Analysis <br />(Exhibit 5) and as summarized in the table below, the estimated total construction <br />delivery cost of the project is $2,112,595. <br />Project Item <br />Total <br />Construction Contract Bid Amount <br />$1,643,676 <br />Construction Administration, Inspection, Testing <br />$246,551 <br />Contract Contingencies <br />$164,368 <br />Design Engineering <br />$58,000 <br />TOTAL ESTIMATED CONSTRUCTION DELIVERY COST <br />$2,112,595 <br />In order to account for the widespread price increases in construction material, Staff <br />recommends reallocating $233,000 in unspent Road Maintenance and Rehabilitation <br />Account (SB-1) funds to supplement the existing construction funding. Funding was <br />