Laserfiche WebLink
CITY OF SANTA ANA <br />RFP NO.: 23-026 <br />WATER RESOURCES FUNCTIONAL SPECIFICATIONS DEVELOPMENT AND SCADA <br />PROGRAMMING SERVICES <br />the site PLC with the HMI acting primarily as a site control interface relaying operator <br />commands to the site PLC. <br />A. DELIVERABLES <br />Upon request, the Consultant shall prepare detailed control panel drawings and <br />specifications for City water production sites. Control panel drawings shall be complete <br />and sufficiently detailed to provide to panel manufacturers and obtain bids for their <br />construction. Control panel drawings shall be in conformance with the City's Control <br />Panel Standards and Specifications and include at a minimum the following: <br />1. Front Panel Layout Drawing <br />2. Back Panel Layout Drawing <br />3. Power Distribution Drawing <br />4. Communication Network Drawing <br />5. Analog Inputs/Outputs Drawing <br />6. Digital Inputs/Outputs Drawing <br />7. Bill of Materials <br />8. 1/0 List with Tag Names <br />9. Specifications for: <br />a. DC Power Components (standard provided by City) <br />b. Ethernet and Networking Components (standard provided by City) <br />c. Telemetry Components (standard provided by City) <br />d. Control Panel Construction (standard provided by City) <br />In addition, the consultant shall provide the following for each requested site: <br />1. 1/0 List <br />2. Complete set of Drawings <br />3. Complete set of associate specification <br />2. FUNCTIONAL SPECIFICATIONS <br />The Consultant shall develop functional specifications based on the future/proposed <br />operation/capabilities gained from updating instrumentation and control devices for the Water <br />Production sites upon request from the City. The Functional Specifications are intended to <br />reflect the ultimate desired operation of each site and not be limited to the operation as it exists <br />currently. The Consultant shall be capable of performing the following tasks: <br />1. Conduct existing condition work sessions with the City Water Production Team to identify <br />existing operational settings, hardware and controls equipment for the Sites. The <br />Consultant shall catalogue all existing controls and equipment and provide <br />recommendations for enhancement and conformance to City's standards. <br />a. The Consultant shall create an 1/0 database to catalogue all system 1/0 and <br />communications, which shall include summaries of the use and function of each. The <br />format and fields shall be developed in collaboration with the City Water Production <br />City of Santa Ana RFP 23-026 <br />Water Resources Functional Specifications Development and SCADA Programming Services <br />Page 15 <br />