Laserfiche WebLink
Construction Contract for Alley Improvements Program <br />August 29, 2023 <br />Page 2 <br />3 <br />6 <br />8 <br />5 <br />concrete alley pavement, sidewalk and driveway approaches with curb and gutter, <br />adjusting utility covers to finished grade, and signing. <br />Public Outreach and Contractor Participation <br />To provide an opportunity for local vendors to submit bids, the City notified a total of 52 <br />regional vendors via PlanetBids, many of which are Santa Ana based. A total of six bids <br />were received. No bids were received from any Santa Ana contractors. <br />As legally required, a Notice Inviting Bids was advertised in the Orange County Register <br />newspaper on June 2, 2023 and July 10, 2023. The project was also advertised in <br />PlanetBids from June 2 through July 10, 2023. Bids were received electronically via <br />PlanetBids on July 10, 2023. No bid protest was submitted by any of the bidders during <br />the bid protest period. <br />Bid Results Summary <br />Rank Bidder’s Name Location Base Bid <br />1 M.S. Construction <br />Management Group Dana Point, CA withdrew bid <br />2 Kalban, Inc.Santa Clarita, CA $3,037,800 <br />3 CJ Concrete Construction, <br />Inc. <br />Santa Fe Springs, <br />CA $3,534,300 <br />4 CT&T Concrete Paving, Inc.Diamond Bar, CA $4,628,838 <br />5 Kazoni Construction Costa Mesa, CA $5,209,550 <br />6 Nationwide Contracting <br />Services, Inc. <br />Huntington Beach, <br />CA $6,354,800 <br />A total of six bids were received. M.S. Construction Management Group, the lowest <br />apparent bidder, had withdrew their bid and were deemed non-responsive. Kalban Inc. <br />submitted the lowest responsive base bid in the amount of $3,037,800 (Exhibit 2). As <br />specified in the bid documents, the lowest bid shall be determined on the basis of the <br />Base Bid. Based on the bid analysis and a contractor’s reference check, Staff <br />recommends awarding the construction contract to Kalban, Inc, in the amount of the <br />base bid totaling $3,037,800 (Exhibit 3). Kalban, Inc. has not performed work in the City <br />of Santa Ana in previous years and this project will be the first. <br /> <br />Project Delivery <br />To deliver a complete project, in addition to the construction contract, the estimated total <br />project delivery cost includes construction administration, inspection, and testing, along <br />with an allowance for contingencies to account for unexpected or unforeseen <br />conditions. Construction administration and inspection includes construction <br />management and materials testing. As indicated in the Cost Analysis (Exhibit 4) and as