North East Annexation Water & Sewer Improvements
<br />November 7, 2023
<br />Page 3
<br />Bid Results Summ
<br />RANK
<br />BIDDER'S NAME
<br />LOCATION
<br />BASE BID
<br />1
<br />Dominguez General Engineering Inc.
<br />Pomona, CA
<br />$2,133,362
<br />2
<br />CEM Construction Corp
<br />Montebello, CA
<br />$2,166,879
<br />3
<br />Big Ben Inc.
<br />Irvine, CA
<br />$2,490,807
<br />4
<br />Vasilij Inc.
<br />Irwindale, CA
<br />$2,497,508
<br />5
<br />Ramona Inc.
<br />Arcadia, CA
<br />$2,887,829
<br />6
<br />Colich & Sons L.P.
<br />Gardena, CA
<br />$3,356,288
<br />7
<br />Kordich Construction Inc.
<br />Cypress, CA
<br />$3,614,148
<br />8
<br />Mike Bubalo Construction Co., Inc.
<br />Baldwin Park, CA
<br />$4,067,887
<br />9
<br />Griffith Company
<br />Brea, CA
<br />$4,161,671
<br />10
<br />Excel Paving Co.
<br />Long Beach, CA
<br />$4,254,341
<br />11
<br />SRK Engineering
<br />Escondido, CA
<br />$4,691,667
<br />Dominguez General Engineering, Inc. submitted the lowest responsive base bid, in the
<br />amount of $2,133,362 (Exhibit 2). As specified in the bid documents, the lowest bid shall
<br />be determined on the basis of the Base Bid. Based on the bid analysis and a
<br />contractor's reference check, staff recommends awarding the construction contract to
<br />Dominguez General Engineering, Inc., in the amount of the base bid totaling $2,133,362
<br />(Exhibit 3).
<br />Dominguez General Engineering, Inc. has not performed as a prime contractor in the
<br />City of Santa Ana within the past five years. A reference check was made and good
<br />reviews were received from other public agencies regarding quality of work performed
<br />by Dominguez General Engineering, Inc.
<br />Project Delivery
<br />To deliver a complete project, in addition to the construction contract bid amount, the
<br />estimated total project delivery cost includes construction administration, inspection,
<br />and testing, along with an allowance for contingencies to account for unexpected or
<br />unforeseen conditions. Construction administration and inspection includes
<br />construction management and materials testing. As indicated in the Cost Analysis
<br />(Exhibit 4) and as summarized in the table below, the estimated total construction
<br />delivery cost of the project is $2,986,706.
<br />
|