Laserfiche WebLink
North East Annexation Water & Sewer Improvements <br />November 7, 2023 <br />Page 3 <br />Bid Results Summ <br />RANK <br />BIDDER'S NAME <br />LOCATION <br />BASE BID <br />1 <br />Dominguez General Engineering Inc. <br />Pomona, CA <br />$2,133,362 <br />2 <br />CEM Construction Corp <br />Montebello, CA <br />$2,166,879 <br />3 <br />Big Ben Inc. <br />Irvine, CA <br />$2,490,807 <br />4 <br />Vasilij Inc. <br />Irwindale, CA <br />$2,497,508 <br />5 <br />Ramona Inc. <br />Arcadia, CA <br />$2,887,829 <br />6 <br />Colich & Sons L.P. <br />Gardena, CA <br />$3,356,288 <br />7 <br />Kordich Construction Inc. <br />Cypress, CA <br />$3,614,148 <br />8 <br />Mike Bubalo Construction Co., Inc. <br />Baldwin Park, CA <br />$4,067,887 <br />9 <br />Griffith Company <br />Brea, CA <br />$4,161,671 <br />10 <br />Excel Paving Co. <br />Long Beach, CA <br />$4,254,341 <br />11 <br />SRK Engineering <br />Escondido, CA <br />$4,691,667 <br />Dominguez General Engineering, Inc. submitted the lowest responsive base bid, in the <br />amount of $2,133,362 (Exhibit 2). As specified in the bid documents, the lowest bid shall <br />be determined on the basis of the Base Bid. Based on the bid analysis and a <br />contractor's reference check, staff recommends awarding the construction contract to <br />Dominguez General Engineering, Inc., in the amount of the base bid totaling $2,133,362 <br />(Exhibit 3). <br />Dominguez General Engineering, Inc. has not performed as a prime contractor in the <br />City of Santa Ana within the past five years. A reference check was made and good <br />reviews were received from other public agencies regarding quality of work performed <br />by Dominguez General Engineering, Inc. <br />Project Delivery <br />To deliver a complete project, in addition to the construction contract bid amount, the <br />estimated total project delivery cost includes construction administration, inspection, <br />and testing, along with an allowance for contingencies to account for unexpected or <br />unforeseen conditions. Construction administration and inspection includes <br />construction management and materials testing. As indicated in the Cost Analysis <br />(Exhibit 4) and as summarized in the table below, the estimated total construction <br />delivery cost of the project is $2,986,706. <br />