My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item HA3 - Agreement with Iron Mountain, LLC
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2023
>
12/05/2023 Regular & HA
>
Item HA3 - Agreement with Iron Mountain, LLC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/1/2023 3:32:27 PM
Creation date
12/1/2023 3:24:42 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Community Development
Item #
HA3
Date
12/5/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
91
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Iron Mountain Government Solutions City of Santa Ana Document Storage <br />and Imaging Services <br />x <br />x <br />Status reviews are conducted through regularly scheduled calls throughout implementation. <br />Ongoing communication with Iron Mountain markets and assigned local project leads. <br />Conducting post-implementation reviews is a critical step in the overall implementation process, <br />enabling a review of the execution and communication strategy. This review addresses any <br />exceptions and reconciliation requirements ensures a seamless and successful transition to the <br />ongoing relationship management team members and highlights opportunities to implement cost- <br />effective program changes. <br />Document Conversion Implementation Plan <br />All digitization projects follow a comprehensive process designed to ensure quality results. Iron <br />Mountain has established an extensive implementation process which includes requirements <br />development with active customer involvement, testing to validate the process and results, and <br />finally initiation of the production phase of the project. Iron Mountain’s implementation process is <br />designed to produce images for our customers that meet all quality expectations. Before full <br />production begins, the testing is extended to the customer for review. Upon approval, the solution is <br />moved to full production. We will provide a detailed implementation plan upon the City exercising an <br />option to execute a scanning project. <br />Change Over/Transition Period <br />As a current provider to the City, any boxes that currently reside at an Iron Mountain record center <br />will remain in place and no transition would be necessary. However, any new records being <br />transferred from the City’s former vendor will follow our standard transition process. Using our <br />proven workflow and experience, Iron Mountain can perform one pickup per day at one location with <br />each truckload containing 400 cartons. The timeline for the process is contingent on how quickly the <br />former vendor releases the records. <br />We will initiate our incoming transition of all SAHA and COSA material by scheduling execution of <br />work flow between 7:00 am -5:00 pm Monday – Friday with the identified SAHA and COSA <br />Operations Supervisor or Contracting Officer. The final schedule will be determined through <br />coordination with the Operations Supervisor or Contracting Officer and based upon the actual <br />identified box count to be transitioned to Iron Mountain’s custody. <br />Iron Mountain will bring empty pallets, plastic wrap, and standard SKP RFID W-Labels to the SAHA <br />and COSA site for each scheduled pick-up. Upon arrival at the SAHA and COSA facility, Iron <br />Mountain will retrieve all identified cartons using our standard 8-block pallet stacking process with <br />the front of the boxes containing the customer’s identifiable number facing out. Iron Mountain will <br />prepare a truck load of pallets which contains ten (10) pallets and each pallet contains 40 cartons. <br />Upon completion, Iron Mountain will affix our unique SKP RFID W-Label on each carton, ensuring no <br />SAHA and COSA labels or other pertinent information is covered, and scan each carton into Iron <br />Mountain’s internal tracking database, SKP which is Iron Mountain’s internal tool to successfully <br />provide inventory management. SKP manages the physical movement of every carton and file in our <br />record centers throughout their lifecycle. Iron Mountain scans every new piece of inventory into our <br />database to ensure we have an accurate inventory of all of our customer’s materials. Iron Mountain <br />will work with the SAHA and COSA Operations Supervisor or Contracting Officer to determine the <br />most effective way to transition all SAHA and COSA’s historic electronic data to our tracking system. <br />Use or disclosure of data contained in this page is subject to the restriction on the title page of this submission.17
The URL can be used to link to this page
Your browser does not support the video tag.