My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 22 - On -Call Emergency Asphalt Concrete, Concrete, and Storm Drain Repair Services
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2024
>
05/21/2024
>
Item 22 - On -Call Emergency Asphalt Concrete, Concrete, and Storm Drain Repair Services
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/16/2024 12:13:08 PM
Creation date
5/16/2024 11:38:13 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
22
Date
5/21/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
159
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
QUANTITIES FOR FEE SCHEDULE (UNDER SEPARATE COVER) <br />For the purposes of providing a Fee Schedule based on the below Sample Task Orders, the <br />following work items and quantities are provided. The Fee Schedule in Attachment 5: <br />Each Fee Schedule shall include a schedule of the hourly billing rates for ALL contractor and <br />subcontractor staff and labor personnel. Additionally, for each discipline that a company seeks to <br />be considered, the below table(s) shall be completed. For example, if a General Contractor is <br />submitting for Asphalt Concrete and Concrete Work, Sample Task Orders A and B would both <br />be required to be completed as part of the Fee Schedule. Each table shall include the filling in of <br />the last two columns for the relevant sample task orders for whichever category(ies) are being <br />submitted for consideration. However, actual work will be paid for as described in Section I <br />"Nature of Work." Sample Task Orders for Asphalt Concrete, Concrete Paving, Stormdrain, and <br />Street Lighting within the public right-of-way related work are, respectively: <br />Sample Task Order A — Asphalt Concrete <br />Item <br />Description <br />Qty <br />Unit <br />Unit Price <br />Total <br />1 <br />Unclassified Excavation <br />550 <br />CY <br />2 <br />AC Pavement <br />130 <br />TN <br />3 <br />Furnish and Install #6 Pullbox <br />4 <br />EA <br />4 <br />Adjust Manhole to Finished Grade <br />5 <br />EA <br />5 <br />PCC Curb & Gutter (Type A-2-8 <br />100 <br />LF <br />6 <br />Si ning & Srtiping <br />1 <br />LS <br />7 <br />Traffic Control Work <br />1 <br />LS <br />Sample Task Order B — Concrete Paving <br />Item <br />Description <br />Qty <br />Unit <br />Unit Price <br />Total <br />1 <br />Unclassified Excavation <br />550 <br />CY <br />2 <br />PCC Sidewalk T=4" <br />2,500 <br />SF <br />3 <br />PCC Curb Ramp <br />3,000 <br />SF <br />4 <br />PCC Curb & Gutter (Type A-2-8 <br />100 <br />LF <br />5 <br />Furnish and Install #6 Pullbox <br />4 <br />EA <br />6 <br />Adjust Manhole to Furnished Grade <br />5 <br />EA <br />7 <br />Catch Basin (Type `B", W=10' <br />1 <br />EA <br />8 <br />Remove and Replace 30" Reinforced Concrete <br />Pipe <br />75 <br />LF <br />9 <br />Guard Rail Replacement Caltrans RSP A77N4 <br />50 <br />LF <br />10 <br />Guard Rail Replacement Caltrans <br />1 <br />EA <br />11 <br />Remove and Replace Chain Link R/W Fence <br />50 <br />LF <br />12 <br />Concrete Barrier Type 83 Caltrans <br />50 <br />LF <br />13 <br />Traffic Control Work <br />1 <br />LS <br />City of Santa Ana RFP 23-182 <br />Page Al-2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.