Item No. 8 — Remove and Replace 30" Reinforced Concrete Pipe
<br />The work under this item consists of grading, compacting subgrade, and constructing Remove
<br />and Replace 30" Reinforced Concrete Pipe and shall be in accordance with the provisions of
<br />Section 306, "Underground Conduit Construction" and any City Standard Specifications, plans,
<br />and/or any City's Special Provisions/Contract Documents provided by the City for each Task
<br />Order.
<br />Payment for Remove and Replace 30" Reinforced Concrete Pipe shall be at the contract unit
<br />price paid per Linear Foot as listed in the Fee Proposal, and shall include full compensation for
<br />doing all work, including removal or replacement of existing pipe, furnishing all materials, labor,
<br />equipment, tools, and incidentals as required to install new pipe, bedding preparation, and no
<br />additional compensation will be allowed therefore.
<br />Item No. 9 — Guard Rail Replacement (Caltrans RSP A77N4)
<br />The work under this item consists of grading, compacting subgrade, and constructing Guard Rail
<br />Replacement (Caltrans RSP A77N4) and shall be in accordance with the provisions of Section
<br />301-1, "Subgrade Preparation," with the provisions of Section 204, "Lumber and Treatment with
<br />Preservatives," Section 304-2.2 "Flexible Metal Guard Rail," any City Standard Specifications,
<br />plans, and/or any City's Special Provisions/Contract Documents provided by the City for each
<br />Task Order.
<br />Payment for Guard Rail Replacement (Caltrans RSP A77N4) shall be at the contract unit
<br />price paid per Linear Foot as listed in the Fee Proposal, and shall include full compensation for
<br />doing all work, including removal or replacement of existing guard rail, furnishing all materials,
<br />labor, equipment, tools, and incidentals as required to install new guardrail, foundation
<br />preparation, and no additional compensation will be allowed therefore.
<br />Item No. 10 - Guard Rail Replacement Termination (Caltrans)
<br />The work under this item consists of grading, compacting subgrade, and constructing Guard Rail
<br />Replacement Termination (Caltrans) and shall be in accordance with the provisions of Section
<br />301-1, "Subgrade Preparation," with the provisions of Section 204, "Lumber and Treatment with
<br />Preservatives," Section 304-2.2 "Flexible Metal Guard Rail," any City Standard Specifications,
<br />plans, and/or any City's Special Provisions/Contract Documents provided by the City for each
<br />Task Order.
<br />Payment for Guard Rail Replacement Termination (Caltrans) shall be at the contract unit
<br />price paid per Each as listed in the Fee Proposal, and shall include full compensation for doing
<br />all work, including removal or replacement of existing guard rail termination, furnishing all
<br />materials, labor, equipment, tools, and incidentals as required to install new guardrail
<br />termination, foundation preparation, and no additional compensation will be allowed therefore.
<br />Item No. 11 — Remove and Replace Chain Link R/W Fence
<br />City of Santa Ana RFP 23-182
<br />Page Al-10
<br />
|