Laserfiche WebLink
The work under this item consists of grading, compacting subgrade, and construction of <br />foundations to support the posts for Remove and Replace Chain Link Fence and shall be in <br />accordance with the provisions of Section 301-1, "Subgrade Preparation," and Section 303-5, <br />"Concrete Curb, Walks, Gutters, Cross Gutters, Alley Intersections, Access Ramps, and <br />Driveways" and Section 304-3 "Chain Link Fence" of the Standard Specifications any City <br />Standard Specifications, plans, and/or any City's Special Provisions/Contract Documents <br />provided by the City for each Task Order. <br />Payment for Remove and Replace Chain Link R/W Fence shall be at the contract unit price <br />bid per Square Foot as listed in the Fee Proposal, and shall include full compensation for doing <br />all work, including removal or replacement of existing chain link fence (and posts/foundations), <br />furnishing all materials, labor, equipment, tools, and incidentals as required and no additional <br />compensation will be allowed therefore. <br />Item No. 12 —Concrete Barrier Type 836 (Caltrans) <br />The work under this item consists of grading, compacting subgrade, and removing and/or <br />construction Concrete Barrier Type 836 (Caltrans) and shall be in accordance with the provisions <br />of Section 301-1, "Subgrade Preparation," Caltrans Standard Specifications, any City Standard <br />Specifications, plans, and/or any City's Special Provisions/Contract Documents provided by the <br />City for each Task Order. <br />Payment for Concrete Barrier Type 836 (Caltrans) shall be at the contract unit price bid per <br />Lineal Foot as listed in the Fee Proposal, and shall include full compensation for doing all work, <br />including removal or replacement of existing concrete barrier or other appurtenances, furnishing <br />all materials, labor, equipment, tools, and incidentals as required and no additional compensation <br />will be allowed therefore. <br />Item No. 13 — Traffic Control <br />The work under this item for Signing and Striping shall be in accordance with the latest Watch <br />Manual, CA MUTCD, Caltrans and any City Standard Specifications, plans, and/or any City's <br />Special Provisions/Contract Documents to be provided for each Task Order Work. <br />Payment for Traffic Control shall be at the contract unit price per Lump Sum (LS) as listed in <br />the Fee Proposal, and shall include full compensation for doing all work, including furnishing all <br />materials, labor, equipment, tools, and incidentals as required and no additional compensation <br />will be allowed therefore. <br />City of Santa Ana RFP 23-182 <br />Page Al-11 <br />