Laserfiche WebLink
Sample Task Order C Items of Work <br />Item No. 1 - Unclassified Excavation <br />Payment for Unclassified Excavation shall be at the contract unit price per Cubic Yard listed in <br />the Fee Proposal, and shall include full compensation for doing all work, including furnishing all <br />materials, labor, equipment, tools, and incidentals as required and no additional compensation <br />will be allowed therefore. <br />Payment for unclassified fill, if any, is considered as included in the unit price paid for <br />unclassified excavation. <br />Payment for over -excavation shall be paid for at the unit price for unclassified excavation. <br />Item No. 2 - Asphalt Concrete (AC) Pavement <br />Payment for Asphalt Concrete (AC) Pavement shall be at the contract unit price bid per Ton as <br />listed in the Fee Proposal, and shall include full compensation for doing all work, including <br />furnishing all materials, labor, equipment, tools, and incidentals as required and no additional <br />compensation will be allowed therefore. <br />Payment for asphalt concrete pavement used in areas of over -excavation to mitigate unsuitable <br />subgrade materials shall be paid for at the contract unit price bid per ton. <br />Item No. 3 — Remove and Replace 18" Corrugated Metal Pipe (CMP) <br />The work under this item consists of grading, compacting subgrade, and constructing Remove <br />and Replace 18" Corrugated Metal Pipe (CMP) and shall be in accordance with the provisions of <br />Section 306, "Underground Conduit Construction" and any City Standard Specifications, plans, <br />and/or any City's Special Provisions/Contract Documents provided by the City for each Task <br />Order. <br />Payment for Remove and Replace 18" Corrugated Metal Pipe (CMP) shall be at the contract <br />unit price paid per Linear Foot as listed in the Fee Proposal, and shall include full compensation <br />for doing all work, including removal or replacement of existing pipe, furnishing all materials, <br />labor, equipment, tools, and incidentals as required to install new pipe, bedding preparation, and <br />no additional compensation will be allowed therefore. <br />Item No. 4 — Remove and Replace 18" Reinforced Concrete Pipe <br />The work under this item consists of grading, compacting subgrade, and constructing Remove <br />and Replace 18" Reinforced Concrete Pipe and shall be in accordance with the provisions of <br />Section 306, "Underground Conduit Construction" and any City Standard Specifications, plans, <br />and/or any City's Special Provisions/Contract Documents provided by the City for each Task <br />Order. <br />City of Santa Ana RFP 23-182 <br />Page Al-12 <br />