Laserfiche WebLink
Payment for Remove and Replace 18" Reinforced Concrete Pipe shall be at the contract unit <br />price paid per Linear Foot as listed in the Fee Proposal, and shall include full compensation for <br />doing all work, including removal or replacement of existing pipe, furnishing all materials, labor, <br />equipment, tools, and incidentals as required to install new pipe, bedding preparation, and no <br />additional compensation will be allowed therefore. <br />Item No. 5 — Remove and Replace 30" Reinforced Concrete Pipe <br />The work under this item consists of grading, compacting subgrade, and constructing Remove <br />and Replace 30" Reinforced Concrete Pipe and shall be in accordance with the provisions of <br />Section 306, "Underground Conduit Construction" and any City Standard Specifications, plans, <br />and/or any City's Special Provisions/Contract Documents provided by the City for each Task <br />Order. <br />Payment for Remove and Replace 30" Reinforced Concrete Pipe shall be at the contract unit <br />price paid per Linear Foot as listed in the Fee Proposal, and shall include full compensation for <br />doing all work, including removal or replacement of existing pipe, furnishing all materials, labor, <br />equipment, tools, and incidentals as required to install new pipe, bedding preparation, and no <br />additional compensation will be allowed therefore. <br />Item No. 6- Catch Basin (Type `B," W=10') <br />The work under this item consists of grading, compacting subgrade, and constructing Catch <br />Basin and shall be in accordance with the provisions of Section 301-1, "Subgrade Preparation," <br />and Section 303-1, "Concrete Structures" and any City Standard Specifications, plans, and/or <br />any City's Special Provisions/Contract Documents provided by the City for each Task Order. <br />Payment for Catch Basin (Type `B," W=10') shall be at the contract unit price paid per Each as <br />listed in the Fee Proposal, and shall include full compensation for doing all work, including <br />removal or replacement of existing catch basins and/or other appurtenances, including furnishing <br />all materials, labor, equipment, tools, and incidentals as required to construct a new catch basin, <br />soil preparation and compaction, and no additional compensation will be allowed therefore. <br />Item No. 7 — Traffic Control <br />The work under this item for Signing and Striping shall be in accordance with the latest Watch <br />Manual, CA MUTCD, Caltrans and any City Standard Specifications, plans, and/or any City's <br />Special Provisions/Contract Documents to be provided for each Task Order Work. <br />Payment for Traffic Control shall be at the contract unit price per Lump Sum (LS) as listed in <br />the Fee Proposal, and shall include full compensation for doing all work, including furnishing all <br />materials, labor, equipment, tools, and incidentals as required and no additional compensation <br />will be allowed therefore. <br />City of Santa Ana RFP 23-182 <br />Page Al-13 <br />