Laserfiche WebLink
SANTAANA VISION ZERO PLAN <br />Santa Ana Vision Zero <br />Fairview St from Edinger Ave to St Andrew PI MAR•T•MAS <br />(Corridor Safety Enhancements including: Protected Corners, Directional Curb Ramps, Centerline Hardening, Class I Bike Path, Bike Crossings, <br />and Conflict Striping) <br />ITEM No. <br />ITEM DESCRIPTION <br />UNIT <br />QUANTITY <br />UNIT PRICE <br />TOTAL <br />ROADWAY <br />1 <br />Install Concrete - Curb Ramp <br />EA <br />18 <br />$ 8,000 <br />$144,000 <br />2 <br />Install Concrete - Median Curb <br />CY <br />21 <br />$ 1,500 <br />$31,500 <br />3 <br />Install Concrete - Truck Apron Curb <br />CY <br />13 <br />$ 1,500 <br />$19,500 <br />4 <br />Install Concrete - Curb and Gutter <br />CY <br />128 <br />$ 1,080 <br />$138,024 <br />5 <br />Install Concrete - Sidewalk <br />CY <br />81 <br />$ 1,040 <br />$84,240 <br />6 <br />Install Concrete - Textured Pavment <br />CY <br />37 <br />$ 1,130 <br />$41,810 <br />7 <br />Install Concrete - Truck Apron <br />CY <br />15 <br />$ 1,860 <br />$27,900 <br />8 <br />Roadway Excavation <br />CY <br />557 <br />$ 260 <br />$144,820 <br />9 <br />Remove Concrete <br />CY <br />881 <br />$ 400 <br />$352,400 <br />10 <br />Hot Mix Asphalt <br />TON <br />213 <br />$ 345 <br />$73,485 <br />11 <br />Slurry <br />TON <br />147 <br />$ 790 <br />$116,130 <br />12 <br />Base Repair (HMA) """" <br />TON <br />598 <br />$ 345 <br />$206,310 <br />13 <br />1 CL2 Aggregate Base <br />CY <br />511 <br />$ 180 <br />$91,980 <br />14 <br />Signing and Striping <br />LS <br />1 <br />$ 25,400 <br />$25,400 <br />15 <br />Multi -use Path (HMA) <br />TON <br />711 <br />$ 345 <br />$245,295 <br />16 <br />Centerline Hardening <br />EA <br />4 <br />$ 5,000 <br />$20,000 <br />17 <br />Rubber Hump <br />EA <br />35 <br />$ 200 <br />$7,000 <br />18 <br />Bus Stop Improvements <br />EA <br />2 <br />$ 30,000 <br />$60,000 <br />ELECTRICAL <br />19 <br />ISignal Modification <br />EA <br />1 <br />$250,000 <br />$250,000 <br />SUBTOTAL <br />$2,079,794 <br />20 <br />IMinor Items (15% of Items 1-19) "" <br />LS <br />1 <br />$312,000 <br />$312,000 <br />SUBTOTAL <br />$2,391,794 <br />21 <br />1 Mobilization (10% of Items 1-20) <br />LS <br />1 <br />$240,000 <br />$240,000 <br />SUBTOTAL <br />$2,631,794 <br />CONTINGENCY (35%) *** <br />$921,200 <br />CONSTRUCTION SUBTOTAL <br />$3,552,994 <br />GRAND TOTAL <br />CONSTRUCTION SUBTOTAL= <br />$3,552,994 <br />Right of Way/Temporary Construction Easement'= <br />$400,000 <br />GRAND TOTAL= <br />$3,952,994 <br />Right of way/TCE's for driveway closures, curb ramps, new signal equipment, conforms, etc. have been estimated at $10K/Location. <br />An additional $300K of roadway easment is estimated for the Multi -use Path. <br />** Minor items (for example, fencing, signage, sidewalk repair, utility adjustments, etc.) have been estimated by using a percentage. <br />*** This feasibility level estimate includes a 35% contingency intended to compensate for the use of preliminary and limited information. <br />**** 8% of project area is assumed to require Base Repair <br />General Note: Where applicable, only minor drainage improvements for transportation projects to address safety are included. Utility improvements such as water, <br />communication, qas, etc. are not included in these estimates. <br />Appendix E <br />