(i) No underground work shall be performed prior to completion of Underground <br /> Service Alert(USA)markings. <br /> (ii) An electrical permit may need to be obtained prior to any additions to the City's <br /> street light or other electrical system. <br /> (iii)All extraordinary work completed by Contractor shall be invoiced time and material <br /> as specified on Contractor's bid proposal <br /> (c) Contractor shall respond to requests by City for extraordinary work within 24 hours of <br /> the request. Work shall start in a timely manner. Contractor shall dispatch personnel, <br /> materials and equipment on a daily basis until work is completed unless conditions do <br /> not allow work to be performed. <br /> 7. Emergency Service <br /> The Contractor shall provide emergency service to the City twenty-four hours a day, seven <br /> days a week upon City's request. Unless stated by the City at the time of request,the <br /> contractor will need to ascertain whether request is of an emergency nature requiring <br /> immediate response. <br /> Failure or malfunction of the street lighting system or interruption of normal operation as <br /> to create confusion or public hazard is considered emergency nature. <br /> (a) The contractor shall provide qualified personnel at the location within 30 minutes of <br /> receiving emergency request. <br /> (b) The Contractor shall make immediate or temporary repairs to City owned streetlight <br /> pole,service pedestal knockdowns,or damage caused by vehicle collision, acts of <br /> God,vandals, or as required because of a public safety hazard. If that is not possible <br /> due to the extent of the damage,sufficient temporary repairs shall be made to safely <br /> the area. In no event shall the electrical system be left exposed causing a safety hazard <br /> to the public. <br /> 8. Compensation For Routine And Extraordinary Maintenance <br /> (a) Routine Maintenance: <br /> Compensation for routine maintenance of street lighting system shall be per <br /> contracted unit price. Said compensation shall include all labor,material, equipment <br /> and overhead/profits. <br /> (b) Extraordinary Maintenance: <br /> Compensation for extraordinary maintenance of street lighting system shall be per <br /> contracted unit price. Said compensation shall include all labor,material, equipment <br /> and overhead/profits. <br /> For work not listed in the bid list, compensation shall be based on agreed lump sum <br /> price or time and material basis. <br /> (i) Materials: The City shall pay the Contractor for materials used in extraordinary <br /> maintenance,the Contractor's cost from the supplier plus the percentage specified <br /> City of Santa Ana RFP 24-046 <br /> Page A1-12 <br />