Laserfiche WebLink
The additional right-of-way of 4 <br />feet between the sidewalk to be <br />constructed and the property line <br />is to be landscaped and incorporated <br />into the on-site landscaping. <br /> <br />1) Construct drive approaches as ap- <br /> proved per City Standard. <br /> <br />m) Repaint street markings as necessary. <br /> <br />2. French Street <br /> <br />a) <br /> <br />Remove and close' existing drive ap- <br />proaches with curb, gutter and side- <br />walk. <br /> <br />b) <br /> <br />Saw cut street tree wells 3 feet x <br />3 feet adjacent to the curb as <br />directed. <br /> <br />Plant street trees per City Standard <br />#124. <br /> <br />d) ~ Reconstruct street lighting as re- <br /> quired. <br /> <br />3. Third Street <br /> <br />a) <br /> <br />b) <br /> <br />Remove all curb, sidewalk, drive ap- <br />proaches, and drain culvert. <br /> <br />Construct A-2 curb and gutter 20 feet <br />from street centerline. <br /> <br />c) <br /> <br />Construct sidewalk adjacent to the <br />curb giving a width of 6 feet curb <br />face to property line, with a trans- <br />ition to a full landing at the corner <br />of French Street. <br /> <br />d) <br /> <br />The additional four feet of right-of- <br />way between the sidewalk and the <br />property line is to be landscaped and <br />incorporated into the on-site land- <br />scaping. Trees in lieu of street <br />trees are to be planted on-site giving <br />an aesthetically pleasing appearance. <br /> <br />e) Construct Ornamental street lighting <br /> with underground power distribution. <br /> <br />f) <br /> <br />Remove and reconstruct paving adjacent <br />to the new gutter, spandrel and x-gut- <br />ter as necessary and to the centerline <br /> <br /> <br />