Laserfiche WebLink
Prior to the release of utilities on the project <br />complete the following. <br /> <br />a) Construct the following street improvements. <br /> <br />1. Fourth Street <br /> <br />a) Remove all curbing, sidewalk and <br /> street lights. <br /> <br />b) <br /> <br />Reconstruct new A-2 curb and gutter <br />at same location as the present curb, <br />joining the curb easterly. The curb <br />is at 28 feet from street centerline. <br /> <br />c) <br /> <br />Remove and reconstruct paving adjacent <br />to the new curb and gutter and as re- <br />quired. <br /> <br />Construct a full 8 foot wide sidewalk <br />adjacent to the curb with street tree <br />wells. <br /> <br />e)~ Plant street trees per City Standard <br /> ;#124. - <br /> <br />NOTE: Contact Clint Jones at the City <br />Yard 834-4922 for details as to lo- <br />cations, eize and species. <br /> <br />f) <br /> <br />Construct ornamental street lighting <br />as required with underground power <br />distribution, modifying the existing <br />system as is necessary. Said light- <br />ing may be a special theme light. <br /> <br />g) <br /> <br />NOTE: Contact City Lighting consul- <br />tant at 834-4929 for details. <br /> <br />Remove the curb return, drain culvert <br />and signal at the corner of French <br />Street. <br /> <br />h) <br /> <br />Construct a new curb return with a <br />35 foot radius with sidewalk landing <br />and a wheelchair ramp if necessary <br />and possible. <br /> <br />i) Relocate and/or reconstruct the signal <br /> system at the corner and as required. <br /> <br />j) <br /> <br />Reconstruct drainage culvert and/or <br />facilities as is necessary. <br /> <br /> <br />