Laserfiche WebLink
11:541, <br /> <br /> d. Additional right-o£-way'and/or easement~ as <br /> required by the approved Site Plan and <br /> directed by the City Engineer. <br /> <br />Note: Ultimate street dedications will also be based <br /> on required parkway widths (curb to property <br /> lines) necessary to accommodate projected <br /> pedestrian flow. <br />Prior to the Release of Utilities, complete the <br />following: <br /> <br />l. Construct storm drain facilities per approved <br /> Runoff Study and as directed by the City Engineer. <br /> <br />2. Construct street improvements per approved <br /> improvement plans. <br /> <br />3. Construct domestic water facilities as directed by <br /> the City Engineer and approved improvement plans. <br /> <br />4. Construct raised and landscaped medians per <br /> approved Channelization Plan and as directed by the <br /> City Engineer. <br /> <br />5. Construct or modify traffic signals per approved <br /> Channelization Plan and as directed by the City <br /> Engineer. <br /> <br />6. Install on-site Channelization and Signage per <br /> approved plan. <br /> <br />7. Install ornamental street lighting with underground <br /> service as directed by the City Engineer. <br /> <br />8. Construct street tree wells and plant minimum size <br /> 24 inch box trees at locations in accordance with <br /> approved improvement plans. <br /> <br />9. Install "No Stopping Anytime" Zones per approved <br /> improvement plans. <br /> <br />-13- <br /> <br /> <br />