My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
NS-2497
Clerk
>
Ordinances
>
2000 - 2010 (NS-2416-2812)
>
2002 (NS-2486 - NS-2519)
>
NS-2497
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 1:01:45 PM
Creation date
6/26/2003 10:08:09 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Ordinance
Doc #
NS-2497
Date
5/6/2002
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Transportation/Circulation ' <br /> <br />PotentiaI traffic in-pacts ass~iated with the impIementation of the DSC project were adequately <br />evaluated in FEIR 96-01. Mitigation measures were identified in FEIR 96-01 to reduce potential <br />transportation impacts to a level considered less than si~ificant. The required traffic nitigation <br />measures fo' DSC have been implemented concurrent with the construction phasing of the project. <br />Certain mitigation measures for the Phase 11 project, such as the ingress and egress traffic ccntrols, xvill <br />be implemented, as allowed by the City of Santa Ans. In addition, a median in Main Place Dfi',e is <br />proposed as part of the project to prohibit left tums into and out of the proposed parking structure. <br />The increased de~,elopment area allmved through Phase II plans would not result in additional traffic <br />impacts, in that the increased development area is.offset by the loss of theater seating thereby resulting <br />in a similar amount of traffic trips that ~ould not exceed the traffic projections in <br />FEI;R 96-01. In addition, the area de',oted to theater lobby/corridors/stairv,~ys and common area has <br />been expanded, while the seatingarea has been reduced. The net square fmtage devoted to exhibit <br />space has also been reduced in the revised Phase II plans. <br /> <br />The proposed median in Main Place Drive prohibits left tums intothe proposed parking structure, <br />thereby facilitating circulatim within the project area ~ith no impact to traffic at blain Place. <br />Implementation of the proposed project would not generate additimal traffic xolumes that would'affect <br />the current and projected level of ser'~ice Mthin the project area be~,ond the impacts prexiously <br />analyzed in FEIR 96-01, nor would the proposed project substantiallyinerease the sexerity of any <br />transportation impact identified in FEIR 96-01. The demand for parking will be handled in the <br />proposed parking structure as calculated abo,'e. Based upon accepted parking calculations for the <br />reduced theater and net exhibit space, required purl/rig is 343 spaces (see Table B) and paring <br />provided is 347 spaces (see Table C). Therefore, there would be no additional impacts to parking <br />above those reported in FEIR 96-01. No new information has been available since preparatim of <br />FEIR 96-01 that would adversely affect the traffic anal3sis and enx'ironmental determinations made in <br />FE[R 96-01. <br /> <br />Air Quall .fy <br /> <br />Potential long-term and short-term air qualityimpacts and cumulative air quality impacts associated <br />with the implementation of the DSC project were adequately evaluated in FEIR 96-01. Nlitigation <br />measures xvere identified in FEIR 96-01 to reduce potential short-term air quality impacts to a level <br />considered less than si~tificant. Additionally, mitigation measures were included in FEIR 96-01 to <br />minimize long-term air qualityimpacts. FE1R 96-01 determined that the development of DSC would <br />result in una'~r>idable adverse long-term air quality impacts. The increased development area, off-set <br />by a reduction in theater seatingand increased space dexoted to storage and non-exhibit public <br />circulation space vAthin the DSC, allowed for in the DSC Phase II, would not generate additional <br />stationary source or mobile source long-term air quality impacts or short-term construction related air <br />quality impacts be2,ond the impacts prexiously analyzed in FEIR 96-01, nor would the proposed <br />project substantiallyincrease the severity of any long-!erin or short-term air quality impact identified in <br />FEIR 96-01. Addiiionally, no new information has been made available since preparation of FEl~. 96- <br />01 that ad~'erselyaffect the air qualityanal~,s[s and environmental determinations made in FE[R 96:01. <br /> <br />Ordinance No. NS-2497 <br /> <br />Page 38 of 4i~iLESXAmcnd I dsc revl.dec ~,0~'07,02,, 6 <br /> ?a'g__e b o[I t <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.