Laserfiche WebLink
said main sewer pipeline and extending from said main <br /> s~wer pipeline to and inside of said curb, and the back- <br /> filling and settling of each of said sewer trenches to a <br /> true and solid surface on the subgrade. <br /> <br /> (c) The construction of a concrete curb along <br /> <br /> the north and south sides of East Seventeenth Street, and <br /> where a street or alley intersects or terminate~ in East <br /> Seventeenth Street then the constr~ct~on of return con- <br /> crete curb on each side of the intersecting or terminating <br /> street or alley to the property line on the north and <br /> south sides of East Seventeenth Street. <br /> <br /> (d) The pavement of East Seventeenth Street by the <br /> construction on the subgrade of a concrete pavement six <br /> inches thick with a belt finish wearing surface and com- <br /> plete to the official grade. <br /> <br /> The work and improvement on the described portion <br /> <br /> of West Seventeenth Street to be as follows: <br /> <br /> (a) The regradfng of West Seventeenth Street to <br /> <br /> a subgrade six inches below the official grade on West <br /> Seventeenth Street as now established. <br /> <br /> (b) The excavation in West Seventeenth Street of <br /> seventeen (lV) lateral house connection sewer trenches, <br /> approximately five feet deep, one trench to be opposite <br /> each lot, piece or parcel of land fronting on ~m. est Seven- <br /> teenth Street, except where a lateral house connection sewer <br /> already exists. Each trench to extend northerly and <br /> southerly, as the case may be, from the main sewer pipe- <br /> line to be constructed along approximately the center line <br /> of West geventeenth Street pursuant to t~is resolution of <br /> intention to the inside of the curb now constructed or to be <br /> constructed pursuant hereto. <br /> <br /> The laying. In each of said trenches of a lateral <br /> house connection sewer constructed of ~-inch inside <br /> diameter vitrified salt glazed cylindrical sewer pipe, <br /> connected with the said main sewer pipeline.and extending <br /> from said main sewer pipeline to and inside of said curb, <br /> and the backfilling and settling of each of said sewer <br /> trenches to a true and solid surface on the subgrade. <br /> <br /> (c) The construction of a concrete curb along the <br /> <br />· north and south sides of West Seventsenth Street, and <br /> where a street or alley intersects or terminates in West <br /> Seventeenth Street then the construction of return concrete <br /> curb on each side of the intersecting or terminating <br /> street or alley to the property line on the north and <br /> south sides of West Seventeenth Street, <br /> <br /> Be and are hereby adopted as and for t~e ~lans and <br /> specifications for t~e doing og said work and the naking <br /> of said improvement. <br /> <br /> <br />