Laserfiche WebLink
pipe storm drains, together with all necessary appurtenances thereto, along each gutter line <br />from the Southeasterly abutment of the bridge to be constructed across Santiago Creek <br />to a line drawn parallel to and distant approximately forty (~0) feet Southeasterly therefrom <br />the construction of'vitrified clay p~pe main sewers, together with all necessary appurtenancei <br />thereto along the Northerly extended center line of Broadway across Santa Ana Boulevard, <br />and between the Northeasterly curb line and the Northeasterly line of S~nta Ana Boulevard <br />from the extended center line to the extended Northerly line of Roe Drive in said City; the <br />installation of cast iron pipe water main, fire hydrants,_and all necessary appurtenances <br />thereto, from Flower Street to a point approximately sixty (60) feet Northwesterly from the <br />Northwesterly abutment of the bridge to be constructed across the Santa Aha River; the <br />construction of reinforced concrete box culverts and all necessary appurtenances thereto <br />across Banta Aha Boulevard at La Veta Avenue, and across Santa Aha B~ulevard at a point <br />approximately Z00 feet Southeasterly from the intersection of the center lines of Santa Aha <br />Boulevard with Chapman Avenue, and the construction of concrete pipe culverts, and all <br />necessary appurtenances thereto, across Santa Ana BAulevard ap~oximately 710 feet Northwest- <br />erly from the intersection of the center lines of S~nta Aha Boulevard with La Veta Avenue, <br />and across Santa Ana Boulevard approximately 880 feet NorthweSterly from the Northerly <br />abutment of the bridge to be constructed across the Santa Ana River. <br /> <br /> That for the acquisition and improvement of Santiago Creek with the necessary <br />revetment work to protect the improvements to be m~de upon and along that portion of the <br />proposed Santa Aha B~ulevard where said Boulevard crosses Santiago Cree, the said improvement <br />will consist of the'~onstruction of wooden pi~e bank ~rotections along the Northerly edge <br />of the channel of said Santiago Creek, from the Northerly abutment of the bridge to be con- <br />structed on Santa Aha Boulevard across said Santiago Creek to a point distant approximately <br />0~0 feet Easterly therefrom, and along the Southerly edge of the said channel from the <br />Southerly abutment of said bridge to a point distant approximately 1~0 feet Easterly therefro~ <br /> <br /> The improvement of Broadway as hereinbefore mentioned, between Santa Clara Avenue <br />and the~Southern Pacific Railroad Company's tracks, shall include the installation of an <br />ornamental lighting system, consisting of cast iron double lighting standards, and all <br />necessary appurtenances thereto, including the connection to the existing system in North <br />Park Eoulevard, also the imprsvement of Broadway between a line drawn parallel to and distant <br />80 feet Southerly from the Easterly extended Southerly line of Charlotte Street, and the <br />improvement hereinbefore mentioned to be constructed in Santa Ana Boulevard,~including all <br />street intersections, shall be improved by the grading and paving with asphaltic concrete <br />pavement on that portion lying Southerly~from the Southern Pacific Railroad Company's tracks, <br />and the placing thereon of a Portland cement concrete pavement on that portion lying Norther~ <br />from the Southern Pacific Railroad Company's tracks, and construction of Portland cement <br />concrete curbs along the curb lines of said street, and at street intersections, around <br />curves to intersect curb lines of said intersecting streets, where curbs do not now exist or <br />replacements are to be made as shown on the plans excepting that portion already improved to <br />the official grade, and such portion of said street as is required by law to be kept in order <br />or r~pair by any person or company having railroad tracks thereon; and also that said portion <br />of Broadway to be paved shall be improved by the construction of vitrified clay pipe main <br />sewer and all necessary appurtenances thereto, from the improvement ~o be constructed in <br />Santa Aha Boulevard to a point approximately fifteen (10) feet Southsrly from the Easterly <br />extended center line of Charlotte Street, and the replacement of Portland cement concrete <br />sidewalks where replacements are necessary, as shown on the plans. <br /> <br /> The improvement of Charlotte Street between Riverside Drive and Broadway by the <br />installation of an ornamental lighting system, consisting of cast iron single lighting <br />standards, and all other necessary appurtenances thereto, including the connection to the <br />existing system in Riverside Drive; also the improvement of Charlotte Street between a line <br />drawn parallel to and distant 80 feet ~esterly from the Westerly line of Broadway, and the <br />Westerly line of Broadway, by the resurfacing th~reof with asphaltic concrete pavement, <br />excepting therefrom any of said work already don~ to the official grade, and the replacement <br />of Portland cement concrete curbs, and portland cement concrete sidewalks, where replacements <br />are necessary, as shown on the plans. <br /> <br /> The improvement of a portion of Roe Drive by the construction of Portland <br />cement concrete~curbs along the Northerly curb line from the Northeasterly line of the propos~ <br />Santa Ana B~ulevard to a point approximately five (0) feet Easterly therefrom and along the <br />Southerly c~rb line fro~ the said Northeasterly line of Santa Aha BoUlevard to a point <br />approximately thirty (GO) feet Easterly therefrom. <br /> <br /> The improvement of a portion of Main Street shall consist of the construction of a <br />concrete pipe storm drain, together with all necessary appurtenances thereto along the westerS <br />side of said street from the northerly curb line of Santa Clara Avenue to a point approximate~ <br />150 feet Northerly therefrom, excepting that portion of the storm drain under the Southern <br />Pacific Railroad Company's tracks. <br /> <br /> The improvement of a portion of Chapman Avenue between the existing Portland <br />cement ~oncrete pavement in said Chapman Avenue ~nd the southerly curb~line theheof, and from <br />the northeasterly line of the proposed Santa .Aha B~ulevard to a line drawn at right angles to <br />the center line of said Chapman Avenue, and dzstan~ 148.~ feet Easterly, measured along said <br />center line from the intersection of said center line of Chapman Avenue with the center line <br />of said Santa Ana B^ulevard, and shall consist of the grading to a subgrade and the pla~tnE <br />thereon of a Portland Cement concrete pavement and the construction of a 'Portland cement <br />doncrete curb along the southerly curb line thereof. <br /> <br /> That Flower Street between a line at right angles to the center line of Flower <br />Street and distant ll00 feet Northerly from the intersection of the center line of Flower <br />Street with the center line of Santa Clara Avenue, and a line drawn through the radius point <br />of the Northwesterly curb return in the intersection of ~lower Street with the proposed Santa <br />Aha Boulevard, which said radius point is located at a point in the Northeasterly line of <br />Santa Aha B ulevard and thirty (30) feet Westerly measured at right angles from the center <br />line of Floger Street and a point on the easterly curb line of Flower Street distant 27 ~eet <br />northerly measured along the said easterly curb line of Flower Street from the northeasterly <br />line of Santa Aha Boulevard, and all of the street intersections between said limits shall~be <br />improved by the grading and placing thereon of a Portland cement concrete pavement, including <br /> <br />Y <br />Y <br /> <br /> <br />