My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 37 - Second Reading Ordinance for ZOA No. 2024-01 for South Coast Technology Center at 3100 West Lake Center Drive
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2024
>
08/20/2024
>
Item 37 - Second Reading Ordinance for ZOA No. 2024-01 for South Coast Technology Center at 3100 West Lake Center Drive
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/14/2024 3:54:52 PM
Creation date
8/14/2024 10:23:39 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Planning & Building
Item #
37
Date
8/20/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
a) Comply with all mitigation measures applicable to the approved Site Plan <br />and as set forth in the Draft EIR and as modified in the response to <br />comments portion of the EIR. <br />b) Comply with the requirements of the Development Agreement, as <br />applicable. <br />4. Any amendments and/or modifications to the project or site plan review <br />approval per Development Project (DP) DP No. 2023-37, including <br />modifications to approved materials, finishes, architecture, site plan, <br />landscaping, and square footages must be submitted to the Planning Division <br />for review. At that time, staff will determine if administrative relief is available, <br />per the following: <br />a. Modifications up to ten -percent (10%) deviations shall be reviewed and <br />approved by the City of Santa Ana's Planning Manager. <br />b. Modifications up to twenty -percent (20%) deviations shall require a <br />discretionary review and approval of a minor exception application by <br />the City of Santa Ana's Zoning Administrator, at a duly noticed public <br />hearing, pursuant to all applicable requirements outlined in the SAMC. <br />c. Modifications exceeding twenty -percent (20%) deviations shall require a <br />discretionary review and approval by the City of Santa Ana's Planning <br />Commission, at a duly noticed public hearing, pursuant to all applicable <br />requirements outlined in the SAMC. <br />5. Prior to the issuance of building permits for any building within the parcels <br />illustrated on Figure 1 (the "Limited Light Industrial Parcels"), a detailed and <br />comprehensive Landscape Plan shall be submitted to the Planning and <br />Building Agency Executive Director or his/her designee for review and approval <br />prior to the issuance of building permits. <br />a. The plan shall comply with the City's Water Efficient Landscape <br />Ordinance (WELD) Chapter 41, Article XVI of the SAMC. The plan shall <br />include an irrigation system layout with the location of controllers and <br />points of connection with data on valve sizes and gallons per minute ( <br />G.P.M.), the size and location of sleeves and all spray heads, including <br />the location of conventional systems and drip systems; an irrigation <br />legend with complete specifications; irrigation notes and construction <br />details of all assemblies and components; a recommended irrigation <br />schedule, preferably on an annual basis; and a summary block on the <br />initial page of submitted plans that will present the above information <br />clearly and accurately. <br />Ordinance No. NS-XXXX <br />Page 13 of 22 <br />
The URL can be used to link to this page
Your browser does not support the video tag.