My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GARDEN GROVE, CITY OF (15)
Clerk
>
Contracts / Agreements
>
G
>
GARDEN GROVE, CITY OF (15)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/5/2024 9:01:03 AM
Creation date
8/29/2024 12:02:01 PM
Metadata
Fields
Template:
Contracts
Company Name
GARDEN GROVE, CITY OF
Contract #
A-1972-17
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br />or required in connection with the construction and <br />2 completion of said Project, including certificate of day <br />3 labor, equipment and material costs, and certification of <br />a completion oil the Project. <br />5 2_. Santa Ana shall <br />6 A. Approve plans and specifications as to design and con- <br />7 struction features affecting the construction,operation <br />8. and maintenance of the portion of the Project within <br />9 Santa Ana. <br />10 S. Approve reap and dead of right of viay and make all the <br />11. necessary arrangements to acquire the right of way for its <br />12 portion of the Project and shall certify to Garden Grove <br />13 prior to the Garden Grove City Council approving the Project. <br />14 . plans and specifications, that such acquisition has been <br />15accomplished. <br />16 C. At all times during the progress of -construction of the <br />1.7 Project have access to the work for the purpose of inspection <br />18 thereof and should. Santa Ana deem any ren,.edial measures <br />is to be necessary, Santa Ana shall no.tify Garden Grove thereof. <br />20 3. Upon completion of the Project, any and all road work necessary <br />21 in connection with the Project, shall be paid for by the respective parties <br />22 on the basis of the actual work done within the limits of their respective <br />23 jurisdictions. <br />24 4. Upor, completion of the Project, Santa Ana's share of the <br />25 traffic signal and intersection lighting system installation will be <br />25 determined in the same ratio to the total cost of such system as the <br />27 number of legs under Santa Ana's jurisdiction entering the intersection <br />28 are to the total number of legs entering the. ntersection. <br />29 5. For the purpose of deteraining the proportionate share of the <br />3� Project cos'cs to be borne by the respective parties hereto the City limits <br />31 and the number of legs entering the intersection under the jurisdiction of <br />32 each party shall be established as those existing at the time the <br />- 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.