My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 16 - Construction Contract with Los Angeles Engineering, Inc. for the Bristol Street
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2024
>
09/17/2024
>
Item 16 - Construction Contract with Los Angeles Engineering, Inc. for the Bristol Street
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/20/2024 10:08:27 AM
Creation date
9/11/2024 9:43:57 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
16
Date
9/17/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
119
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
,ENVIRONMENTAL IMPACT REPORT ADDENDUM <br />Bristol Street Widening Phase IIIA — Civic Center Drive to Washington Avenue <br />Civic Center Drive and <br />Washington Avenue <br />Difference between No Project and with Project Emissions <br />Bristol Street Between <br />Civic Center Drive and -24 -3 -4 0 -1 -1 <br />Washington Avenue <br />SCAQMD Significance 550 55 55 150 150 55 <br />Thresholds <br />Exceeds Thresholds No No No No No No <br />Source: Air Quality Assessment Report (URS 2013a), <br />Notes mph = miles per hour; CO = carbon monoxide; ROG = reactive organic gases; NOx = nitrogen oxides; SCz = sulfur dioxide; PM10 = <br />particulate matter less than less than or equal to 10 microns In diameter; PM2.5 = particulate matter less than less than or equal to 2,5 microns <br />in diameter. <br />TABLE 4 YEAR 2035 WITH AND WITHOUT PROJECT AIR POLLUTANT EMISSIONS <br />Year 2035 No Project <br />Bristol Street Between Civic <br />Center Drive and 13 35 3 6 0 2 2 <br />Washington Avenue <br />Year 2035 with Proiect <br />Bristol Street Between Civic <br />Center Drive and <br />20 29 2 4 0 2 1 <br />Washington Avenue <br />Difference between No Project and with Project Emissions <br />Bristol Street Between Civic <br />Center Drive and <br />-6 -1 -1 0 -1 -1 -6 <br />Washington Avenue <br />SCAQMD Significance <br />Thresholds <br />550 55 55 150 150 55 <br />Exceeds Thresholds <br />No No No No No No <br />Source: Air Quality Assessment Report (URS 2013a). <br />Notes: mph = miles per hour; CO = carbon monoxide; ROG = reactive organic gases; NOx = nitrogen oxides; S02 = sulfur dioxide; PMlo = <br />particulate matter less than less than or equal to 10 microns in diameter; PM25 = particulate matter less than less than or equal to 2,5 microns <br />in diameter. <br />c.) Result in a cumulatively considerable net increase of any criteria pollutant for which the project <br />region is non -attainment under an applicable federal or state ambient air quality standard <br />(including releasing emissions which exceed quantitative thresholds for ozone precursors)? <br />The SCAB is designated by the EPA and the State as being nonattainment for 03, PM10, and PM2.5. In <br />accordance with SCAQMD methodology, any project that does not exceed or can be mitigated to less <br />than the daily threshold values does not add significantly to a cumulative impact. As mentioned above, <br />the development of the proposed Project demonstrates that construction and operational activities would <br />not result in emissions in excess of SCAQMD's threshold values. Since the proposed Project would not <br />exceed the SCAQMD's significance thresholds for construction activities or the operations phase, the <br />SCAQMD does not consider emissions from the Project's emissions to add significantly to any <br />cumulative impact. Furthermore, it should be noted that the proposed Project would increase the capacity <br />ANA 305-011 (PER 02) CITY OF SANTA ANA (01/19/2015) YU PAGE 32 <br />
The URL can be used to link to this page
Your browser does not support the video tag.