My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
LANDSCAPE IRRIGATION CONSULTING
Clerk
>
Contracts / Agreements
>
L
>
LANDSCAPE IRRIGATION CONSULTING
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/9/2025 3:01:57 PM
Creation date
9/18/2024 2:42:56 PM
Metadata
Fields
Template:
Contracts
Company Name
LANDSCAPE IRRIGATION CONSULTING
Contract #
A-1993-124
Agency
Parks, Recreation, & Community Services
Destruction Year
1998
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Task I _.aster Irrigation Utili.tie: flan <br />A. Review conceptual Zoo Long Range Master Plan so as <br />to provide a project overview as related to the <br />preparation of the Master Irrigation Utilities <br />Plan. <br />B. Perform hydraulic analysis necessary to prepare <br />Master Irrigation Utilities Plan. This plan shall <br />include: <br />1. Irrigation water service zones. (Probable <br />limits of irrigation systems controlled by <br />each irrigation point of connection and <br />irrigation controller.) <br />2. Irrigation sleeving requirements for proposed <br />roadway crossings. <br />3. Preliminary irrigation water meter locations <br />and available water pressures. <br />4. Preliminary electrical service locations for <br />automatic sprinkler controllers and irrigation <br />booster pumps. <br />5. Requirements for implementation of a central <br />irrigation computer control system with <br />moisture sensors. <br />6. Routing and size of irrigation distribution <br />main line loop including proposed stub -outs <br />required for future connection to proposed <br />future phases of zoo.' <br />C. Attend up to two(2) meetings with client and/or <br />team consultants as required. <br />D. Coordinate irrigation utility plan with other City <br />departments and/or consultants on project team as <br />necessary. <br />Task II - Master Domestic Water Distribution Plan <br />A. Review conceptual Zoo Long Range Master Plan to <br />provide a project overview related to preparation <br />of the Master Domestic Water Distribution Plan. <br />B. Perform hydraulic analysis necessary to prepare <br />domestic water distribution plan. This plan shall <br />include: <br />1. Domestic water service zones. (Probable flows <br />related to fire flow and potable water needs <br />for each phase of proposed zoo facilities.) <br />2. Domestic water sleeving requirements for <br />proposed roadway crossings. <br />3. Preliminary domestic water meter locations and <br />available water pressures. <br />zooirr.agr <br />10/25/93 <br />page 3 of 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.