Laserfiche WebLink
4. Routing and size of domestic water <br />distribution main line loop including proposed <br />stub -outs required for development of domestic <br />water distribution system to proposed future <br />zoo construction phases. <br />C. Attend up to two (2) meetings with client as <br />required. <br />D. coordinate irrigation utility plan with other City <br />departments on project team as necessary. <br />Task III - Interim Irrigation Design <br />A. Provide interim irrigation design that will address <br />the irrigation requirement of the existing zoo <br />facilities. Note that as new zoo facilities are <br />developed, the interim irrigation system will be <br />removed and replaced with a new permanent <br />irrigation system. The interim irrigation design <br />will consider the main line distribution and <br />control requirements of the future permanent <br />irrigation system; however, the design of the <br />future systems is not included as a part of this <br />proposal. <br />B. Meet on -site with City landscape maintenance <br />personnel to review proposed equipment, <br />construction methods and/or problems associated <br />with the construction of irrigation system. <br />C. Meet with City staff to review irrigation <br />consultant's recommendations in order to establish <br />irrigation design parameters. <br />D. Provide irrigation design plans, including drafting <br />of heads, pipe, valves, related equipment, and <br />title sheet. <br />E. Provide all necessary irrigation construction <br />details, notes and legend. <br />F. Provide final irrigation specifications, including <br />preparation of City boiler plate. <br />G. Provide final water service, irrigation electrical <br />service and irrigation sleeving information as part <br />of the irrigation plans. <br />H. Attend up to four (4) meetings with the City of <br />Santa's designated staff for coordination and <br />clarification. <br />I. Adhere to City of Santa Ana standards and <br />requirements for irrigation design and <br />construction. <br />J. Coordinate irrigation design with other consultants <br />on the project team as directed by the City of <br />Santa Ana. <br />K. Provide final irrigation cost of construction <br />estimate. <br />zooirr.agr <br />.10/25/93 <br />page 4 of 12 <br />