Laserfiche WebLink
d) Deliverables and Documentation <br /> Step 1 Deliverables <br /> • Kick-Off Meeting—this is an onsite meeting with City staff to prepare everyone for the process <br /> of implementation that is about to get underway and get everyone excited about their role in the <br /> process. During this onsite trip the IKC Project Manager also meets with Core Team members to <br /> work on finalizing an overall project plan and to train Core Team members on various facets of the <br /> overall system that will assist them in their efforts to define the city's system requirements for the <br /> most effective implementation overall. <br /> • Project Plan —A Project Plan defining the above Project Time line in more detail, with starting <br /> and ending dates defined,will be finalized during this step of the implementation. <br /> Step 2 Deliverables <br /> • Analysis Meetings—analysis meetings are necessary for defining GAPs and needs in the areas of <br /> Configuration, Interfaces, Reports, and Conversion. Configuration meetings are generally held <br /> onsite due to the multiple department coordination necessary for many processes. Other analysis <br /> is generally effectively done via web meetings. <br /> • To-Be Configuration Documentation/GAP Documentation —Documentation will be provided <br /> for each Process,Report and Interface. This documentation will begin as`to-be'or what is planned <br /> and approved for each item and will be used by IKC and Gray Quarter staff as a blue-print for the <br /> development. If modifications are found necessary to these documents during the process of <br /> development the documents will be updated and finalized, otherwise the original documents will <br /> be considered final. <br /> Step 3 Deliverables <br /> • Record Development—up to 175 Record Types, within 4 department modules <br /> o Building—up to 50 records <br /> o Enforcement—up to 5 records <br /> o Planning—up to 80 records <br /> o Public Works—up to 40 records <br /> • Report Configuration—Documentation provided within this RPF demonstrates the potential for <br /> up to 138 Reports to be developed. After review the data provided, IKC believes that several of <br /> these reports could be facilitated with simple filters/queries and/or system searches with simple <br /> configuration considerations and/or could be written by City after they have attended Reports <br /> Training. Because of this IKC is including 85 reports for the purposes of the cost proposal for this <br /> RFP. The includes up to 85 Reports, including: <br /> o Low Complexity Reports—up to 15 <br /> Includes documents such as Transmittals and Expiration Letter. These types of reports <br /> generally have no more than 5 fields pulling from the Civic Platform database with the <br /> majority of the report being hard coded. <br /> o Medium Complexity Reports—up to 50 <br /> Includes reports such as Permits and Project Activity Reports. These types of reports <br /> generally have several fields pulling from the Civic Platform database with some hard <br /> coded information also included. <br /> o High Complex Reports—up to 20 <br /> Includes reports such as Financial Reports, Statics and reports that require data from <br /> multiple tables in the database. These types of reports pull data from multiple Civic <br /> Page I17 <br />