My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BRIDGEROCK CONSTRUCTION, INC. (EL SALVADOR PARK RESTROOM IMPROVEMENTS)
Clerk
>
Contracts / Agreements
>
PROJECTS
>
BRIDGEROCK CONSTRUCTION, INC. (EL SALVADOR PARK RESTROOM IMPROVEMENTS)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/26/2025 10:38:23 AM
Creation date
12/12/2024 10:37:54 AM
Metadata
Fields
Template:
Contracts
Company Name
BRIDGEROCK CONSTRUCTION, INC.
Contract #
P23-6035, 22-1416
Agency
Public Works
Expiration Date
1/1/1900
Insurance Exp Date
1/1/1900
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MEMORANDUM <br /> Alvaro Nunez <br /> To: City Manager Date: May 20,2025 <br /> Nabil Saba, Executive Director <br /> From: Public Works Agency <br /> Project No. 22-1416 El Salvador Restroom Renovations <br /> Subject: Change Order 1 <br /> Provided below is the cost breakdown for Change Order#01 Project 22-1416 El Salvador <br /> Restroom Renovations <br /> CONTRACTOR : Bridgerock Construction Inc. <br /> 524 S 4t"Ave. <br /> La Puente, CA 91746 <br /> PROJECT DESCRIPTION: Project No. 22-1416 El Salvador Restroom Renovations <br /> CHANGE ORDER NUMBER: 1 CHANGE ORDER AMOUNT: $35,934.57 <br /> ACCOUNTING UNIT-ACCOUNT-ACTIVITY NUMBER: 18117013-66220-22141601029 - $35,934.57 <br /> JUSTIFICATION—UNFORESEEN CONDITIONS <br /> 1. Change Order Item #1.1 To compensate the contractor for costs associated with relocating main <br /> power feed for the park lights out of the way of door openings for new restroom stalls. Installed a <br /> concrete floor box to slice connections and reroute conduit. (PCO#1) <br /> This change order item addresses layout conflicts encountered. These adjustments were essential since <br /> the conduit was positioned in the path of door openings for the restroom stalls, which would have <br /> interfered with the operation of the doors and created a potential obstruction. <br /> AGREED PRICE: $3,510.14 <br /> JUSTIFICATION—PROJECT IMPROVEMENTS <br /> 2.Change Order Item#1.2: To compensate the contractor for costs associated with adjusting hollow metal <br /> doors to add 6" gap at bottom. (PCO #2) <br /> This change order item was initiated at the City's request to improve both the functionality and security of <br /> the restroom facilities. This modification ensures better air circulation, and reduces the potential for <br /> individuals to slip into the restroom unnoticed or to use the area for unintended purposes. <br /> AGREED PRICE: $2,299.77 <br />
The URL can be used to link to this page
Your browser does not support the video tag.