Laserfiche WebLink
Sidewalk Replacement Project <br />January 21, 2025 <br />Page 2 <br />curb and gutter, driveways, and curb ramps (Exhibit 1). The Sidewalk Replacement <br />Program makes repairs citywide, every year focusing on a specific geographic area of <br />the City. This fiscal year will focus on the west side of the City. Once completed, these <br />improvements will improve the City's overall sidewalk conditions, enhance the visual <br />appearance of the street, upgrade pedestrian access, drainage, and support <br />compliance with Americans with Disabilities Act (ADA) standards. <br />Public Outreach and Contractor Participation <br />To provide an opportunity for local vendors to submit bids, the City notified a total of 62 <br />regional vendors via PlanetBids, many of which are Santa Ana based. Furthermore, <br />staff specifically reached out to Santa Ana vendors to encourage their participation in <br />bids. A total of 12 bids were received. No bids were received from Santa Ana <br />contractors. <br />As legally required, a Notice Inviting Bids was advertised in the Orange County Register <br />newspaper on October 1, 2024 and October 8, 2024. The project was also advertised in <br />PlanetBids from October 1, 2024 to October 24, 2024. Bids were received electronically <br />via PlanetBids on October 24, 2024. No bid protest was submitted by any of the bidders <br />during the bid protest period. <br />Bid Results Summary <br />RANK <br />BIDDER'S NAME <br />LOCATION <br />BASE BID + <br />ALTERNATES <br />1 <br />Aguilar & Calderon Corporation <br />Whittier, CA <br />$731,255 <br />2 <br />CJ Concrete Construction, Inc. <br />Santa Fe Springs, CA <br />$747,705 <br />3 <br />SAVI Construction Inc. <br />Chino, CA <br />$784,505 <br />4 <br />Hardy & Harper, Inc. <br />Lake Forest, CA <br />$800,015 <br />5 <br />Nobest Incorporated <br />Westminster, CA <br />$868,555 <br />6 <br />Carter Enterprises Group Inc. <br />Anaheim, CA <br />$876,000 <br />7 <br />Asad Holdings LLC <br />Laguna Hills, CA <br />$892,025 <br />8 <br />Addison -Miller Inc. <br />Orange, CA <br />$970,605 <br />9 <br />Vido Samarzich, Inc. <br />Rancho Cucamonga, CA <br />$978,280 <br />10 <br />A M Concrete, Inc. <br />Thousand Oaks, CA <br />$998,505 <br />11 <br />EBS General Engineering Inc. <br />Corona, CA <br />$1,124,305 <br />12 <br />Aster Construction Services, <br />Inc. <br />Los Angeles, CA <br />$1,546,905 <br />A total of 12 bids were received and 12 were deemed responsive. Aguilar & Calderon <br />Corporation submitted the lowest responsive base bid and bid alternates in the amount <br />of $731,255 (Exhibit 2). As specified in the bid documents, the lowest bid shall be <br />determined on the basis of the Base Bid. Based on the bid analysis and a contractor's <br />reference check, staff recommends awarding the construction contract to Aguilar & <br />Calderon Corporation (Exhibit 3). <br />