Laserfiche WebLink
RESOLUTION NO. <br />PAGE EIGHT <br /> <br />87- 38 <br /> <br />Over 100 and not over 500 HP, KW, <br />KVA each .............................. $30.00 <br /> <br />Over 500 HP, KW, KVA each ............. $40.00 <br /> <br />The following fees include all switches, <br />receptacles, fixtures, and outlets: <br /> <br />Receptacles, outlets, light <br />fixtures, and general use switches, <br />each .................................. $ <br /> <br />.5O <br /> <br />Signs and high potential gas <br />tube lighting, each: .................. $15.00 <br /> <br />NOTE: This shall include all necessary <br /> control equipment. <br /> <br />Temporary services: <br /> <br />Temporary electric service prior to <br />final approval or occupancy, <br />each meter ........................... $100.00 <br /> <br />Temporary work with service, <br />each meter ............................ $15.00 <br /> <br />Temporary power - construction: <br /> <br />For services supplying a temporary <br />power pole, pedestal or piggyback ..... $25.00 <br /> <br />For a system of distribution and <br />utilization of poles for temporary <br />construction power, each pole ......... $ 5.00 <br /> <br />Temporary construction lighting: <br /> <br />500 lamps or less ..................... $ 2.00 <br /> <br />Over 500 lamps ........................ $ 4.00 <br /> <br />Time clock or photo electric cell, each .... $ 3.00 <br /> <br />Swimming pool, fountains, spas ............. $35.00 <br /> <br />Busways, special raceways, under floor <br />duct, trolley or plug-in busways each <br />one hundred (100) feet or fraction <br />thereof .................................... $ $.00 <br /> <br />II <br /> <br /> <br />