My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
87-091
Clerk
>
Resolutions
>
CITY COUNCIL
>
1952 - 1999
>
1987
>
87-091
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 12:32:34 PM
Creation date
6/26/2003 10:46:56 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Resolution
Doc #
87-91
Date
12/7/1987
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RES. 87-91 <br /> <br /> D. Improvements to Main Street along Project site <br />frontage shall include a raised median. <br /> <br /> E. A neighborhood monitoring study shall be <br />completed prior to occupancy of Phases II through V of the <br />Project or as required by the City. These studies shall be <br />conducted to detect any neighborhood through-traffic caused <br />by the Project. These studies shall include field surveys, <br />analysis and specifications for reducing or eliminating such <br />impacts, if found. <br /> <br /> 2. Project Traffic Circulation and Project Access. <br />The following measures are set forth in the EIR: <br /> <br /> A. Establishment of site access locations and <br />characteristics as indicated in Appendix B to the EIR. <br /> <br /> B. Implementation of the site's internal <br />circulation plan to public street standards and as <br />conceptually depicted in Figure 5 of the EIR. <br /> <br /> 3. Air Quality -- Short Term. The following <br />mitigation measures are set forth in the EIR: <br /> <br /> A. Grading activities shall comply with South <br />Coast Air Quality Management District Rule 403, which <br />requires watering for the control of dust. <br /> <br />B. Construction roads shall be paved. <br /> <br /> C. Construction equipment shall be maintained in <br />proper condition. <br /> <br /> D. Construction shall be discontinued during <br />first and second stage smog alerts. <br /> <br /> 4. Natural Gas, Electricity, and Telephone Service. <br />The following mitigation measures are set forth in the EIR: <br /> <br /> A. Energy conservation programs will be <br />implemented in the Project wherever feasible. <br /> <br /> B. A telephone system shall be installed on the '- <br />subject property, intended for acceptance by Pacific Bell and <br />built to Pacific Bell's specifications. <br /> <br /> 5. Demolition of Existin~ On-Site Water Wells. The <br />EIR sets forth that all necessary permits from the Orange County <br /> <br />-6- <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.