My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
90-098
Clerk
>
Resolutions
>
CITY COUNCIL
>
1952 - 1999
>
1990
>
90-098
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/28/2015 1:46:21 PM
Creation date
6/26/2003 10:46:58 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Resolution
Doc #
90-98
Date
10/1/1990
Document Relationships
90-099
(Amended By)
Path:
\Resolutions\CITY COUNCIL\1952 - 1999\1990
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4].4 <br /> <br />Implementation of the project would result in the need for additional telecommunication facilities <br />on the project site, and the reinforcement of the existing telecommunication facilities within the <br />project site. <br /> <br />Mitigation Measures <br /> <br />Reinforcement of omite telephone, facilities shall be implemented by the project <br />applicant. Onsite telephone facilities intended for acceptance by Pacific Bell shall <br />be built to Pacific Bell specifications. <br /> <br />Effect <br /> <br />Implementation of the project would result in the need to construct new or modified electrical <br />and natural gas systems within the project site. <br /> <br />Mitigation Measures <br /> <br />Prior to building permit issuance, the project applicant shall consult with Southern <br />California Electric and Southern California Gas representatives to ensure the <br />proposed project design is compatible with existing electrical and natural gas <br />services and to reduce impacts of possible short-term outages to existing <br />customer~ during construction. <br /> <br />Onsite water lines will need to be upgraded to accommodate the additional development proposed <br />by the project. <br /> <br />Mitigation Measure <br /> <br />Prior to building permit issuance, plans for priw~te onsite water supply I'acilities <br />to serve the project (fire hydrants and water lines) shall be reviewed and <br />approved by the City of Santa Aha Public Works Department, and shall be <br />installed subsequently by tbe project applicant. <br /> <br />J B 1/0885PA)01 .SOF 26 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.