Laserfiche WebLink
4].4 <br /> <br />Implementation of the project would result in the need for additional telecommunication facilities <br />on the project site, and the reinforcement of the existing telecommunication facilities within the <br />project site. <br /> <br />Mitigation Measures <br /> <br />Reinforcement of omite telephone, facilities shall be implemented by the project <br />applicant. Onsite telephone facilities intended for acceptance by Pacific Bell shall <br />be built to Pacific Bell specifications. <br /> <br />Effect <br /> <br />Implementation of the project would result in the need to construct new or modified electrical <br />and natural gas systems within the project site. <br /> <br />Mitigation Measures <br /> <br />Prior to building permit issuance, the project applicant shall consult with Southern <br />California Electric and Southern California Gas representatives to ensure the <br />proposed project design is compatible with existing electrical and natural gas <br />services and to reduce impacts of possible short-term outages to existing <br />customer~ during construction. <br /> <br />Onsite water lines will need to be upgraded to accommodate the additional development proposed <br />by the project. <br /> <br />Mitigation Measure <br /> <br />Prior to building permit issuance, plans for priw~te onsite water supply I'acilities <br />to serve the project (fire hydrants and water lines) shall be reviewed and <br />approved by the City of Santa Aha Public Works Department, and shall be <br />installed subsequently by tbe project applicant. <br /> <br />J B 1/0885PA)01 .SOF 26 <br /> <br /> <br />