Laserfiche WebLink
428 <br /> <br /> A'I~I'ACHMENT A <br /> <br />LAKE CENTER SPECIFIC DEVELOPMENT <br />MITIGATION MONITORING PLAN <br /> <br />EARTH RESOURCES <br /> <br />Grading shall be conducted by the project applicant in accordance with plans prepared <br />by a civil engineer and based on recommendations of a soil engineer and an <br />engineering geologist subsequent to the completion of a comprehensive soil and <br />geologic investigation for the proposed structures. Permanent reproducible copies of <br />the "Approved as Built' grading plans on standard size sheets shall be furnished by the <br />project applicant to the Building Department. <br /> <br />Till~ing of Implemerltation/Verification: <br /> <br />Prior to grading permit issuance & during <br />grading operation <br /> <br />Method of Verification: <br /> <br />Grading phm check and periodic field <br />inspection during grading operation <br /> <br />Rq:sponsible Par~y: <br /> <br />Inspection Services Manager, Building <br />Division <br /> <br />Verification (Names & Dates): <br /> <br />A complete erosion study shall be prepared by the project applicant prior to the start <br />of any grading activities to minimize the erosion potential created during development, <br />and grading operations by the applicant shall be in conformance with all City of Santa <br />Aha ordinances pertaining to grading. <br /> <br />Timing of ImplemelltationNerificatiom <br /> <br />Prior to grading permit issuance and <br />during grading operation <br /> <br />Method of Verification: <br /> <br />Grading plan check and periodic field <br />inspections <br /> <br />Responsible Party: <br /> <br />Inspection Services Manager, Building <br />Division <br /> <br />Verification (Name & Date): <br /> <br />JB 1/0gg50OOI.A A-1 <br /> <br /> <br />