Laserfiche WebLink
429 <br /> <br />Possible water erosion during construction shall be mitigated by the installation of <br />temporary erosion control devicea by the project applicant, as required by the State <br />Regional Water Quality Control Board. <br /> <br />Timing of Implementation/Verification: <br /> <br />Prior to grading permit issuance and during <br />grading operation <br /> <br />Method of Verificatioll: <br /> <br />Grading plan check and periodic field <br />inspections <br /> <br />Responsible Party: <br /> <br />Inspection Services Manager, Building <br />Division <br /> <br />Verification (Name & Doto); <br /> <br />Utilization of desiltation devices such as sandbags in area~; that may discharge into <br />city streets shall be implemented by the project applicant prior to the commencement <br /> <br />of grading activities. <br />Timing of ImplementationNerifica~ion: <br /> <br />Method of Verification: <br /> <br />Responsible Party: <br /> <br />Verification (Name & Date): <br /> <br />Prior to grading permit issuance <br /> <br />Grading plan check and field inspection <br /> <br />Inspection Services Manager, Building <br />Division <br /> <br />The grading plan prepared by the applicant shall include a description of haul routes, <br />access points to the site, and a watering and sweeping program designed to minimize <br />impacts of haul operations. <br /> <br />Timing of Implementation/Verification: <br /> <br />Prior to approw~l of any grading permits <br />and implementation during grading phase <br /> <br />Method of Verificaliorl: <br /> <br />Grading plan check and periodic field <br />inspections <br /> <br />Responsible Party: <br /> <br />Inspection Services Manager, Building <br />Division and Engineering Services <br />Manager, Design Engineering Division <br /> <br />Verification (Name & Date}; <br /> <br />JB 1/08850001.A A-2 <br /> <br /> <br />