My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
90-113
Clerk
>
Resolutions
>
CITY COUNCIL
>
1952 - 1999
>
1990
>
90-113
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/28/2015 1:52:56 PM
Creation date
6/26/2003 10:46:58 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Resolution
Doc #
90-113
Date
12/17/1990
Document Relationships
91-056
(Amended By)
Path:
\Resolutions\CITY COUNCIL\1952 - 1999\1991
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TABLE 1 <br /> <br />MITIGATION MoNIToRING REOUIREMENTS <br /> <br />Mitigation Measure <br /> <br />Seismic Hazar~ <br /> <br />As part of the engineering and preparation of <br />design plans, structural and soils engineers <br />will be retained to determine the structural <br />stability, of the Santiago Creek Bridge, with <br />regard to a potential subsidence event. These <br />assessments will include recommendatiom, if <br />needed, to prox,lde adequate structural <br />support for the bridge. <br /> <br />Consideration ',,.'ill be given to installing and <br />replacing surface level structures such as <br />street lights, traffic signals and utJii~' poles. <br /> <br />footings that reach stable material. <br /> <br />Ero~on <br /> <br />If reconstruction of the Santiago Creek Bridge <br />supports is deternfined to be necessary. <br />construction actixfdes x~511 be limited to ti~e <br />dD' season. Desi~ and construction will be <br />coordinated with the Orange CounD <br />Environmental Management Agency and the <br />State Department of Fish and Game. <br /> <br />Timin~o of Implementation <br /> <br />During preparation of design plant for the <br />bridge widening. <br /> <br />During preparation of design plans for all <br />phases of project. <br /> <br />Scheduling to be determined during final <br />design construmion. ConslruCtion controls <br />as scheduled. <br /> <br />Responsible Entities <br /> <br />City Public Works Agency <br />Consulting Engineers <br /> <br />City Pnblic Works Agency <br />Consulting Engineers <br /> <br />Ci~' Public Works Agency <br />Orange County. Environmental Manage- <br />ment Agency <br />California Department of Fish and Game <br /> <br />Z6 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.