My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
91-003
Clerk
>
Resolutions
>
CITY COUNCIL
>
1952 - 1999
>
1991
>
91-003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 12:31:37 PM
Creation date
6/26/2003 10:46:58 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Resolution
Doc #
91-3
Date
1/7/1991
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
V. EFFECTS BETEI~IvlINED TO BE MITIGATABLE TO A LEVEL OF INSIGNIFICANCE <br /> <br />WATER QUALITY <br /> <br />Significant Effect <br /> <br />In the short term, erosion could occur during construction of the proposed project. Over <br />the long term, the proposed project would result in continued surface runoff from the <br />project site. <br /> <br />Finding <br /> <br />Finding <br /> <br />Changes or alterations have been required in, or incorporated into, the <br />project which avoid or substantially lessen the significant environmental <br />effect identified in the Final EIR. <br /> <br />Facts in the Support of the Finding <br /> <br />Grading and construction will result in disruption of the existing site, which could result <br />in wind and water erosion. [n the long term, surface runoff from the project site would <br />continue and would be expected to contain urban related constituents, including <br />concentrations of lead, copper, zinc and other materials. These effects can be <br />substantially reduced, to a level of insignificance, through project design and other <br />mitigation measures as identified in the Final EIR. The mitigation measures to reduce <br />these effects as incorporated in the proposed project are: <br /> <br />The project will require installation and maintenance of erosion control devices in <br />accordance with the policies of the City of Santa Aha. These devices will not be <br />removed or modified without the approval of the City Building officials. <br /> <br />o <br /> <br />During the rainy season~ equipment and materials will be stored on site for rapid <br />construction of temporary erosion control devices, Workers and equipment will be <br />available for emergency construction and maintenance of these devices, <br /> <br />Removable erosion protection devices will be in place at the end of each working <br />day when the five day rain probability forecast exceeds ~,0 percent, <br /> <br />After a rainstorm, the contractor will remove all silt and debris from streets, check <br />berms and basins. <br /> <br />Should any project generated sediment be deposited in City storm drains during <br />construction, the Register shall fund any required cleanup to the mutual <br />satisfaction o[ the Register and the City, <br /> <br />Graded areas on the site perimeter will be graded to drain away from the [ace of <br />slopes at the end of each working day. Drainage will be directed toward desilting <br />facilities. <br /> <br />The contractor will take necessary precautions to prevent trespass or public access <br />onto areas where water is impounded. <br /> <br />ge <br /> <br />An emergency telephone number will be posted by the Contractor for immediate <br />notification if emergency conditions arise. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.