My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
93-036 - Environmental Impact Report for the Main Street Concourse Project
Clerk
>
Resolutions
>
CITY COUNCIL
>
1952 - 1999
>
1993
>
93-036 - Environmental Impact Report for the Main Street Concourse Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 12:31:17 PM
Creation date
6/26/2003 10:46:59 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Resolution
Doc #
93-36
Date
4/19/1993
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
124
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
GEOLOGY <br />8. (1) <br /> <br />9. (2) <br /> <br />All structures shall be designed in accordance with the current Uniform Building Code <br />and the seismic design parameters of the Structural Engineers Association of California <br />and to meet the requirements of the City. <br /> <br />Timing of Implementation/Verification <br /> <br />Prior to approval of any grading <br />permits; during grading/ <br />construction phase <br /> <br />Method of Verification <br /> <br />Grading plan check and field <br />inspection <br /> <br />Responsible Parties <br /> <br />Senior Plan Check Engineer, <br />Building Division; Inspection <br />Services Manager, Building <br />Division. <br /> <br />Frequent in-grading inspections should be conducted during construction. These <br />inspections are necessary to substantiate previous geologic findings and to discover <br />unforeseen conditions that may be exposed during grading. Any unanticipated adverse <br />conditions encountered should be evaluated by the project engineering geologist and <br />the soils engineer. Feasible and appropriate recommendations made shall be followed. <br /> <br />Timing of Implementation/Verification <br /> <br />During grading phase <br /> <br />Method of Verification <br /> <br />Grading plan check and field <br />inspection <br /> <br />Responsible Parties <br /> <br />Senior Plan Check Engineer, <br />Building Division; Inspection <br />Services Manager, Building <br />Division <br /> <br />841 <br /> <br />0 <br />0 <br /> <br />/B3/S:l 1340001 .MM A-5 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.