My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
93-036 - Environmental Impact Report for the Main Street Concourse Project
Clerk
>
Resolutions
>
CITY COUNCIL
>
1952 - 1999
>
1993
>
93-036 - Environmental Impact Report for the Main Street Concourse Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 12:31:17 PM
Creation date
6/26/2003 10:46:59 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Resolution
Doc #
93-36
Date
4/19/1993
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
124
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
342 <br /> <br />AIR 0UALIT¥ <br /> <br />Short-Term Construction Impacts <br /> <br />10. (1) To minimize dust generated during grading operations, SCAQMD Rule 403 shall be <br /> adhered to. This will require watering during earthmoving operations. In addition, soil <br /> binders shall be spread on construction sites or unpaved roads and/or parking areas. <br /> Also, street sweeping of roads adjacent to the project site shall be done weekly during <br /> active grading to reduce fugitive dust from traffic. Finally, truck wheels shall be <br /> washed off and loads covered each time trucks leave the construction site. These <br /> measures will be incorporated as conditions of any grading permit. <br /> <br /> Timing of Imolementation/Verification Prior to grading permit issuance; <br /> during construction <br /> <br /> Method of Verification Grading plan check and periodic <br /> field inspection during grading <br /> operations <br /> <br /> Responsible Parties Environmental Coordinator, and <br /> Supervisor of Inspections, <br /> Building Division <br /> <br />1 I. (2) Construction equipment shall be properly maintained and tuned at least monthly to <br /> reduce pollutant emissions. <br /> <br />Timing of Implementation/Verification <br /> <br />Method of Verification <br /> <br />Responsible Parties <br /> <br />During grading/construction <br />operations <br /> <br />Grading plan check and field <br />inspection <br /> <br />Environmental Coordinator, and <br />Supervisor of Inspections, <br />Building Division <br /> <br />A-6 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.