My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
93-036 - Environmental Impact Report for the Main Street Concourse Project
Clerk
>
Resolutions
>
CITY COUNCIL
>
1952 - 1999
>
1993
>
93-036 - Environmental Impact Report for the Main Street Concourse Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 12:31:17 PM
Creation date
6/26/2003 10:46:59 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Resolution
Doc #
93-36
Date
4/19/1993
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
124
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
343 <br /> <br />12. (3) <br /> <br />13. <br /> <br />14. (4) <br /> <br />In order to minimize traffic congestion, short-term construction affecting roadways <br />shall be performed during non-peak traffic hours (i.e., 10 a.m. to 4 p.m.). Long-term <br />roadwork, such as for the realignment of Owens Drive, shall have traffic control plans <br />during construction to reduce congestion and delay, subject to approval of the City of <br />Santa Aha. <br /> <br />Timing of Implementation/Verification <br /> <br />Prior to grading permit issuance; <br />during construction; posting of <br />complaint hotline number to field <br />office <br /> <br />Method of Verification <br /> <br />Grading plan check and field <br />inspection <br /> <br />Responsible Parties <br /> <br />Environmental Coordinator, <br />Planning Department, and <br />Development Engineering, <br />Engineering Services Manager <br /> <br />Prior to issuance of a grading permit, haul routes for trucks shall be identified in order <br />to minimize travel through residential neighborhoods, thereby minimizing exposure of <br />sensitive receptors to potential air quality impacts related to grading truck emissions <br />and fugitive dust. <br /> <br />Timing of Implementation/Verification <br /> <br />Condition of grading permit <br />issuance <br /> <br />.Method of Verification <br /> <br />Grading plan check <br /> <br />Responsible Parties <br /> <br />Development Engineering <br />Division, Engineering Services <br />Manager <br /> <br />Grading activities shall be stopped during high wind conditions greater than 25 miles <br />per hour. <br /> <br />Timing of Implementation/Verification <br /> <br />Condition of grading permit; <br />wind speed gauge with warning <br />light; grading contractor <br /> <br />Method of Verification <br /> <br />Grading plan check and field <br />inspection <br /> <br />Responsible Parties <br /> <br />Inspection Services Manager, <br />Building Division; Environmental <br />Coordinator <br /> <br />0 <br /> <br />0 <br />0 <br /> <br />0 <br /> <br />0 <br /> <br />A-7 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.