My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
93-036 - Environmental Impact Report for the Main Street Concourse Project
Clerk
>
Resolutions
>
CITY COUNCIL
>
1952 - 1999
>
1993
>
93-036 - Environmental Impact Report for the Main Street Concourse Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 12:31:17 PM
Creation date
6/26/2003 10:46:59 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Resolution
Doc #
93-36
Date
4/19/1993
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
124
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
15. <br /> <br />16. <br /> <br />17. <br /> <br />To reduce short-term particulate emissions related to construction activities, incentives <br />such as monthly bus passes, transit information and vanpools will be provided, at no <br />cost to all construction workers who request them, to reduce trips. Prior to submission <br />of the grading plan, the developer shall submit to the City the incentives which are <br />prqposed to reduce work trips. The effectiveness of these measures shall be monitored <br />every month by the developer and verified by tile City. <br /> <br />Timine of Implementation/Verification <br /> <br />Prior to issuance of grading <br />permit; <br /> <br />Method of Verification <br /> <br />Written report documenting <br />monthly bus passes issued and <br />vanpool ridership <br /> <br />Responsible Parties <br /> <br />Developer/applicant; <br />Environmental Coordinator, <br />Planning Division, and <br />Development Engineering, <br />Engineering Services Manager <br /> <br />Groundcover shall be reestablished on graded areas not scheduled for construction <br />within 90 days of grading. <br /> <br />Timing of Implementation/Verification <br /> <br />Condition of grading plan <br />approval <br /> <br />Method of Verification <br /> <br />Grading plan check and field <br />inspection <br /> <br />Responsible Parties <br /> <br />Landscape Associate, Case <br />Planner, Planning Division <br /> <br />Traffic speeds on all unpaved road surfaces shall be restricted to 15 miles per hour or <br />less. <br /> <br />Timing of Implementation/Verification <br /> <br />Condition of grading plan <br />approval <br /> <br />Method of Verification <br /> <br />Grading plan check and field <br />inspection <br /> <br />Responsible Parties <br /> <br />Building Division; grading <br />contractor, Development <br />Engineering, Engineering <br />Services Manager <br /> <br />JB3/S:11340001 .MM A-8 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.