My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
93-036 - Environmental Impact Report for the Main Street Concourse Project
Clerk
>
Resolutions
>
CITY COUNCIL
>
1952 - 1999
>
1993
>
93-036 - Environmental Impact Report for the Main Street Concourse Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 12:31:17 PM
Creation date
6/26/2003 10:46:59 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Resolution
Doc #
93-36
Date
4/19/1993
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
124
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
345 <br /> <br />18. <br /> <br />The use of low sulfur fuel or Iow emission state-approved fuels may be used for <br />stationary construction equipment which are commercially available. <br /> <br />Timing of Implementation/Verification <br /> <br />Condition of all bid permits (as <br />specified in bid packet) <br /> <br />Method of Verifi{;ation <br /> <br />Grading plan check and field <br />inspection <br /> <br />Responsible Parties <br /> <br />Building Inspector, Building <br />Division <br /> <br />Lang-Term Vehicular Emissions <br /> <br />19. (5) <br /> <br />The applicant shall implement the City-mandated transportation demand management <br />(TDM) program, consistent with the TDM Strategy Plan, described in Section 4.10 and <br />Appendix F of the RDEIR. The TDM program shall include ridesharing/carpooling <br />inducements and inducements to reduce peak hour trips to and from the project. The <br />effectiveness of the TDM in reducing a.m. peak-hour trips shall be documented and <br />fines shall be imposed by the City for the nonattainment of TDM goals. (See MMP <br />No. 79) <br /> <br />Timing of Implementation/Verification <br /> <br />Prior to occupancy permit <br />issuance; ongoing during life of <br />project <br /> <br />Method of Verification <br /> <br />Driveway counts (for specifics <br />see TDM program), field <br />inspection after occupancy, <br />verification of traffic report for <br />Phases I and II. Written report <br />to be provided by applicant <br />annually. <br /> <br />Responsible Parties <br /> <br />Engineering Services Manager, <br />Development Engineering <br />Division; owner; tenants <br /> <br />JB3/S:II340001.MM A-9 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.