Laserfiche WebLink
Mitigation Measures Timing of Implementation/ Method of Verification <br /> Verification Responsible Parties <br />AIR QUALITY <br /> <br />1. To minimize dust generated by coeslmction operations, the Condition of grading pemfit (note on P~iodic field inspection during grading Environmmtai Coordinator, Planning Division; <br />applicant shall apply watm' or dust suppr~ta to espoced ce~ g~ading plan) and oonstmction Inspection Services Manager, Building Division; Project <br />surface during clca~lg, grading, e. ardanoving and Otbet Site Contractor <br />prcpa,"ation work. Water shill be applied twice daily and dust <br />supprc~inn materials should be applied as needed, <br />2. To minimize dust from consu~ction vehicles, wheel washers Condition of gx~ding permit (note on Grading plan check; periodic field Environmental Coordinator, Planning Division <br />Shall be placed ut thc project anu'ance at Main Street nd vehicle grading plan) inspanfions during g~'acling opet~ions Inspection Sorvices Supervisor, Building Division; <br />wheals shall be hosed dorm prior to exiting onto Main SU~et. Project Contractor <br />]. Street sweeping on roads adjacent to the project site shall bc During g~miing and const~ction Periodic field inspection during grading Environmental Coordinator, Planning Division <br />done weekly by thc ~ootractor dm'lng site grading to reduce fugitive open~tinns and consu~crioo Inspection Services Supervisor, Building Division; <br />dust from traffic. Project Contractor <br />4, Thc contractor shall plant MI d~urbed ~ ~ the Folinwingsiteprcpasat~nact~vitiesand Grading, architectural, and landscaping Environmental Coordinator, Landscape Associstc and <br />cemplctinnofsit~prepa~-afionactivifias, prior to issum~ce of Certificate of pin check; periodic field inspection Case Planner, Planning Division; Inspection Scrvicc~ <br /> Occupancy following grading operations Supervisor, Building Division; Project Contractor <br />5. To reduce vehicular congestion and emissions, thc applicant Prior to issuance of Certificate of Interviews with rcsponsibin pa~tias Environmental Coordinator, Case Planner, Planning <br />shall investigate thc fcnsibility of ope~adng a shu~e in conjunction Occupancy Division; Project Applicant; Main Place representative <br />with Main Place that would set, ice thc two desfinadmu. <br /> <br />TRANSPORTATION AND CIRCULATION ~ <br />Phase I: <br /> <br />1. Attheproj¢ctcnUance, astopsigfland~pevcmantmaskers Prior to issuance of Certificate of Finallnapccrion Environmental Coordinator, Case Planner, Plnrming <br />shall bc installed, allowing Fight-turn Oct nnd left-tam th ancess. Occupancy for Phase I Division; Engineming Services Manager, Development <br /> Engincering Division; Project Applicant <br />2. Tbeapplicantshallprovidcbicyclcinckcrsonsitenndaceessto Prior to issuance of C..eflJficate of Finall~pection Environmental Coordinator, Case Planner, Pisnning <br />the bike t~aiL (~cy for Phaso I Division; Engthccfing Services Manager, Devcinpmant <br /> Engineering Division; Psojcct Applicant <br />3. TheapplicantshallconstFantonaltebusdropoffarce. Prior to issuance of Certificate of FinalInspection Environmental Coordinator, Case Planner, Planning <br /> Occupancy for phose I Division; Engineering Services Manager, Development <br /> Engineering Division; Project Applicant <br />Phase Ih <br />4. TAc applicant shall pay City of Santa AAA TSIA fees. [ Prior to issuance of building permits [ Writxcn verification of canceled checks £ngincering Services Manager, Development <br />I <br /> Engineering Division; Public Works ^gcncy <br /> <br />5 <br /> <br /> <br />