Laserfiche WebLink
170 <br /> <br />ENVIRONMENTAL EVALUATION <br />ER # 98-047 <br />PROJECT TITLE: BROCK HOMES 72 UNIT SUBDIVISION <br />PROJECT ADDRESS: 2828 NORTH BRISTOL STREET <br />June 8, 1998 <br />PAGE 3 <br /> <br />fe <br /> <br />ge <br /> <br />e <br /> <br />Prior to the issuance of grading permits, the <br />grading plan shall include a description of access <br />points to the site and a watering and sweeping <br />program designed to minimize impacts of haul <br />operations. <br /> <br />Construction-related erosion is not expected to modify <br />river or stream channels or the bed of any bays, inlets, <br />or lakes. The Santa Ana River has been extensively <br />modified through the installation of concrete banks and <br />river bed to serve as a flood control system. As a <br />result, the proposed project will not alter the current <br />configuration of the stream bed. Construction-related <br />and long-term erosion can be mitigated to a level of <br />insignificance. <br /> <br />Mitigation Measures/Monitoring <br />Mitigation Measures Nos. 3-6. <br /> <br />Required: Same as <br /> <br />The potential for earthquakes affects all of Southern <br />California. There are no active faults on the project <br />site. This potential impact is not considered a <br />significant constraint to the development of the project; <br />however implementation of seismic design provisions for <br />structural safety will help minimize threats to human <br />safety in the event of an earthquake. <br /> <br />Mitigation Measures/Monitoring Required= <br /> <br />Ail structures shall be designed in accordance with <br />the seismic design provisions of the Uniform <br />Building Codes to promote maximum safety in the <br />event of an earthquake. <br /> <br /> <br />