Laserfiche WebLink
171 <br /> <br />ENVIRONMENTAL EVALUATION <br />ER # 98-047 <br />PROJECT TITLE: BROCK HOMES 72 UNIT SUBDIVISION <br />PROJECT ADDRESS: 2828 NORTH BRISTOL STREET <br />June 8, 1998 <br />PAGE 4 <br /> <br />® <br /> <br />AIR RESOURCES <br /> <br />During construction of the proposed development, air <br />quality in the local area will be impacted. Short-term <br />construction-related activities will cause combustion <br />emissions and fugitive dust to be released from on-site <br />construction equipment and from off-site vehicles hauling <br />building materials. Short term impacts will be mitigated <br />to a level of insignificance. Long term impacts to air <br />quality may occur but are considered to be cumulatively <br />insignificant as this site was previously occupied by a <br />large multi-family apartment project. The cumulative <br />trips generated by the proposed 72 unit development will <br />be less than the previous project. <br /> <br />Mitigation Measures/Monitoring Required: <br /> <br />Ail unpaved construction areas shall be watered at <br />least twice a day during excavation and <br />construction. <br /> <br />Wheel washers shall be installed where vehicles <br />exit unpaved roads onto paved roads or wash off <br />trucks and any equipment leaving the site before <br />every trip. <br /> <br />be <br /> <br />Construction and implementation of the proposed project <br />will not use materials which would create significant <br />objectionable odors. No impacts are anticipated. <br /> <br />Mitigation Measures/Monitoring Required: None required. <br /> <br />Construction of the proposed project will not affect air <br />movement. Further, changes in moisture, temperature and <br />climate (locally) will not occur if this project is <br />implemented as proposed. No impacts are anticipated. <br /> <br />Mitigation Measures/Monitoring Required: None required. <br /> <br /> <br />