My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
98-026
Clerk
>
Resolutions
>
CITY COUNCIL
>
1952 - 1999
>
1998
>
98-026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 12:30:07 PM
Creation date
6/26/2003 10:47:01 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Resolution
Doc #
98-26
Date
7/6/1998
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
172 <br /> <br />ENVIRONMENTAL EVALUATION <br />ER $ 98-047 <br />PROJECT TITLE: BROCK HOMES 72 UNIT SUBDIVISION <br />PROJECT ADDRESS: 2828 NORTH BRISTOL STREET <br />June 8, 1998 <br />PAGE 5 <br /> <br />WATER RESOURCES <br /> <br />The proposed project will not produce a change in <br />currents or the course of direction of water movements, <br />in either marine or fresh waters. The project site is <br />adjacent to the Santa Ana River; however, no new drainage <br />is proposed. The site had previously been developed with <br />a large multi-family residential project that drained to <br />the river bed, this same system will be utilized for the <br />new project. <br /> <br />Mitigation Measures/Monitoring Required: None required. <br /> <br />The proposed project may create a change in surface <br />drainage patterns or absorption. The city of Santa Ana <br />Public Works Agency has identified mitigation to lessen <br />this impact to a level of insignificance. <br /> <br />Mitigation Measures/Monitoring Required: <br /> <br />10. <br /> <br />Prior to the issuance of a building permit, the <br />applicant shall submit a surface drainage plan <br />showing the direction and means of flow. The plan <br />is to include existing and proposed elevations at <br />and adjacent to all property lines. Drainage <br />routed to the street must be directed beneath the <br />sidewalk and through the curb. <br /> <br />The proposed project would not produce any significant <br />alterations to the course or flow of flood waters. No <br />impacts are anticipated. <br /> <br />Mitigation Measures/Monitoring Required: None required. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.