Laserfiche WebLink
624 <br /> <br />ENVIRONMENTAL EVALUATION <br />ER #98-06O <br />EAST SECOND STREET LIVE/WORK ARTIST <br />201 N. MAIN STREET <br />Revised December 14, 1998 <br />PAGE 12 <br /> <br />f® <br /> <br />The proposed project will not have a significant impact <br />on solid waste disposal. <br /> <br />Mitigation Measures/Monitoring Required: None Required <br /> <br />ge <br /> <br />The proposed project will require modifications to the <br />existing water system. Implementation of the following <br />mitigation measures will lessen impacts to a level of <br />insignificance. <br /> <br />Mitigation Measures/Monitoring Require4~ <br /> <br />12. <br /> <br />Prior to the issuance of a building permit for <br />Phase I, the applicant shall cut, plug and remove <br />the existing outdated 8" water main and construct a <br />new 6" water main and appurtenances within a new <br />"exclusive underground, non-exclusive, public <br />service easement; along the abandoned portion o2 24 <br />Street between Main and Bush Streets on this site, <br />to accommodate the water needs of Lots 8 through <br />14, and also relocating the existing fire hydrant <br />located on the southwest corner of Bush and 2~ <br />Streets to Bush Street per City Standards and <br />approved plans. <br /> <br />13. <br /> <br />Prior to the issuance of a building permit for <br />Phase I, the applicant shall construct a new 6" <br />water main along the northerly portion of the <br />proposed "Phase I" area within a new "exclusive <br />underground, non-exclusive public service <br />easement", betwee~ Main and Bush Streets to <br />accommodate the water needs of Lots 1 through 7. <br /> <br />14. <br /> <br />Prior to the issuance of a building permit for <br />Phase I, the applicant shall cut, plug and remove <br />the existing outdated 4" water main and construct a <br />new 8" water main and appurtenances in Bush Street <br />from Third Street to First Street per City <br />Standards and approved plans. <br /> <br />15. <br /> <br />Prior to the issuance of a building permit for <br />Phase II, the applicant shall cut, plug and remove <br />of the existing outdated 8" water main along the <br /> <br /> <br />