Laserfiche WebLink
625 <br /> <br />ENVIRONMENTAL EVALUATION <br />ER #98-060 <br />EAST SECOND STREET LIVE/WORK ARTIST <br />201 N. MAIN STREET <br />Revised December 14, 1998 <br />PAGE 13 <br /> <br />abandoned portion of 2~ Street between Bush and <br />Spurgeon Streets. Construct a new 6" water main and <br />appurtenances to accommodate the water needs of <br />Lots 15 through 18, and relocate the existing fire <br />hydrant located on the southwest corner of Spurgeon <br />and 2~ Street to Spurgeon Street per city Standards <br />and approved plans. <br /> <br />16. <br /> <br />Prior to the issuance of a building permit for <br />Phase II, the applicant shall construct all new 6" <br />water mains within the new "exclusive underground, <br />non-exclusive public service easements", on the <br />proposed private streets and esplanade easements <br />throughout the "Phase II" area to accommodate the <br />water needs of Lots 29 through 46. Lots 19 through <br />28 shall be served directly by Spurgeon Street <br />water main. <br /> <br />XIII. <br /> <br /> a. <br /> <br />The proposed project will minimally obstruct any existing <br />scenic vistas or views open to the public. The site plan <br />for the subject property shall be reviewed by the <br />Planning Division for consistency with design standards <br />which shall contribute to the continued revitalization of <br />the City of Santa Aha. <br /> <br />MITIGATION MEASURES/MONITORING REQUIRED~ None Required <br /> <br />The proposed project will have no demonstrable negative <br />aesthetic effect. <br /> <br />Mitigation Measures/Monitoring Require4~ None Required <br /> <br />The proposed project will introduce new lighting. <br />Potential impacts will be mitigated to a level of <br />insignificance through implementation of the following <br />mitigation measure. <br /> <br />Mitigation Measures/Monitoring Required: <br /> <br />17. Ail outdoor lighting shall be hooded and directed <br /> <br /> <br />