My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
P & D CONSULTANTS 1b
Clerk
>
Contracts / Agreements
>
INACTIVE CONTRACTS (Originals Destroyed)
>
P (INACTIVE)
>
P & D CONSULTANTS 1b
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/23/2021 3:04:49 PM
Creation date
10/23/2003 11:11:09 AM
Metadata
Fields
Template:
Contracts
Company Name
P & D Environmental, a division of P & D Consultants
Contract #
A-2001-015
Agency
Planning & Building
Council Approval Date
2/5/2001
Expiration Date
12/31/2004
Insurance Exp Date
4/1/2005
Destruction Year
2009
Notes
Amends A-1999-129, 129A Amended by A-2003-196, A-2003-258
Document Relationships
P & D CONSULTANTS 1
(Amends)
Path:
\Contracts / Agreements\ INACTIVE CONTRACTS (Originals Destroyed)\P (INACTIVE)
P & D CONSULTANTS 1a
(Amends)
Path:
\Contracts / Agreements\ INACTIVE CONTRACTS (Originals Destroyed)\P (INACTIVE)
P & D CONSULTANTS 1c
(Amended By)
Path:
\Contracts / Agreements\ INACTIVE CONTRACTS (Originals Destroyed)\P (INACTIVE)
P & D CONSULTANTS 1d
(Amended By)
Path:
\Contracts / Agreements\ INACTIVE CONTRACTS (Originals Destroyed)\P (INACTIVE)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Dan Bott • <br />City of Santa Ana <br />• January 15,2001 <br />Page 5 <br />Cost to do the above work is as follows: <br />Env. Planner 2 Hrs. @ $65 Hr. $130 <br />Air Quality <br />This section of the EIR was prepared by P&D based on the air quality analysis prepared by our <br />air quality subconsultant. We were ready to drop the study into the second screencheck Draft <br />EIR. However, because of changes in the One Broadway Plaza Project, the air quality analysis <br />will need to be revised. As discussed in the attached scope of work from Mestre Greve, local air <br />pollution concentrations will be recalculated using the CALINE4 program and the revised traffic <br />data. Any new impacts will be identified and mitigation measures developed, if required. <br />Construction emissions will be re -calculated as required based on the new site plan. <br />Construction emissions impacts and mitigation will be reassessed as required. Long-term <br />regional pollutant emissions from the project will be recalculated based on the new site plan and <br />traffic data. Project impacts and required mitigation will be reassessed as required. <br />Cost to do this work is as follows: <br />Bob Rusby 1 Hrs. @ $125 Hr $ 125 <br />Env. Planner 4 Hrs. @ $ 65 Hr. $ 260 <br />Mestre Greve $1,800 <br />Total $2,185 <br />Aesthetics <br />The Aesthetics section was completed in the previously prepared screencheck Draft EIR. This <br />section will have to be revised to reflect the change in the footprint of the parking garage. It will <br />also address the visual effect of removal of a different configuration of structures along <br />Broadway Street. Figure 3.11.1 (Photo Point Key) will have to be replaced to show the <br />expanded parking garage plot plan and the elimination of most of the structures along Broadway <br />Street. Figure 3.11-3 (Proposed and Existing Elevations) will also have to be revised to show the <br />remaining structures along Broadway Street and changes to the facade of the project office <br />building and garage. <br />The project shade shadow analysis has also been completed and will need to be revised to reflect <br />the relocated parking garage. Figure 3.11-5 (Winter Parking Garage Shadow) and Figure 3.11-7 <br />(Summer Parking Garage Shadow) will have to be revised to show all of the area covered by the <br />enlarged parking garage. Figure 3.11-4 (Winter Office Tower Shadow) will also need to be <br />revised to show all of the area covered by this shadow. <br />The discussion of the project's light and glare impact will be revised to discuss the fact that the <br />office building will be lighted at night and the steel/aluminum accents on the building facade <br />may cause some light reflection off the building. <br />
The URL can be used to link to this page
Your browser does not support the video tag.